IMCO General Construction Inc 11/13/2018
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 10:26:57 AM
Creation date
11/15/2018 10:50:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction 2/18/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 2/6/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 3/16/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc 2/25/2025 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction Inc 4/15/2020 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc. 11/4/2020 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I. Figure dimensions on drawings shall govern over scale dimensions and detail drawings shall govern <br /> over general drawings. In the event an item of Work is described differently in two or more locations <br /> on the Drawings and in the Specifications, the Contractor shall, upon request of the Owner's <br /> Representative, submit in writing to the Owner's Representative the description upon which the <br /> Contractor relied in preparing its Bid or laying out the Work. If the Owner's Representative directs <br /> the Contractor to perform Work in a manner other than that contemplated by the Contractor in <br /> ' preparing its Bid or laying out the Work, Change Order procedures will be followed. In this event, <br /> the Contractor shall submit to the Owner's Representative such supporting information, including <br /> bidding or layout documents, as may reasonably be necessary for the Owner's Representative to <br /> determine whether the Contract Sum is increased,decreased or unchanged by the Change Order. <br /> C. Utilities <br /> I. General <br /> a. The Owner has endeavored to determine the existence of utilities at the Site of the Work from <br /> the records of the owners of known utilities in the vicinity of the Work. The positions of these <br /> utilities as derived from such records are shown on the Drawings. No excavations were made to <br /> ' verify the locations shown for underground utilities. The service connections to these utilities <br /> are not shown on the Drawings. It shall be the responsibility of the Contractor to determine the <br /> exact location of utilities and service connections thereto. Such field verification must be <br /> ' performed in sufficient time so as not to impede the progress of the Work or fabrication of <br /> materials to be incorporated into the Work. The Contractor shall call the Utility Location <br /> Request Center (one call center) for location of utilities in the field not less than two nor more <br /> than ten business days before the scheduled date of commencement of excavation. The <br /> Contractor shall make its own investigations, including exploratory excavations, to determine <br /> the locations and type of existing utilities, including service connections, prior to commencing <br /> work that could result in damage to such utilities. The Contractor shall immediately notify the <br /> Owner's Representative as to any utility discovered by him in a different position than shown on <br /> the Drawings or which is not shown on the Drawings. No excavation shall begin until all known <br /> facilities in the excavation areas have been marked. Contractor shall coordinate its activities <br /> with the utility provider. Contractor shall bear the cost of maintaining utility service. <br /> ' b. The Contractor should be aware of, and comply with, Chapter 19.122 RCW, a law relating to <br /> underground utilities. The Owner shall not pay Contractor any of Contractor's cost of <br /> complying with this law, and repairing or indemnifying any damage or injury arising out of <br /> Contractor's failure to comply with this law. <br /> c. Owner does not represent or warrant who may be obligated to pay for the cost of relocation or <br /> temporary maintenance of the utility. Contractor shall investigate whether such cost must be <br /> borne by the owner of the utility. <br /> d. Governmental agencies and owners of utilities reserve the right to enter upon streets, alleys, <br /> rights-of-way, or easements for the purpose of making changes in their property made necessary <br /> by the Work and for the purpose of maintaining and making repairs to their property. <br /> ' 2. Known Utilities <br /> a. The Contractor shall provide at its sole expense all labor, equipment, materials and services <br /> necessary to remove,relocate, or maintain utilities specified on the Drawings. The work on each <br /> ' utility shall be performed in a manner satisfactory to the utility owner. The utility owner has the <br /> option of doing such work with its own forces at the Contractor's expense, or permitting the <br /> work to be performed by the Contractor. <br /> 3. Service Connections <br /> a. Locations of service connections are not identified on the Drawings. The Contractor shall <br /> provide at its sole expense all labor, equipment and material to remove, relocate or maintain <br /> service connections. Work on service connections shall be performed in a manner satisfactory to <br /> ' the service connection owner. The service connection owner has the option of doing such work <br /> with its own force at the Contractor's expense, or permitting the work to be performed by the <br /> Contractor. <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> GENERAL CONDITIONS <br /> 00 72 13-11 Issue for Bid <br />