My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 11/13/2018
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 10:26:57 AM
Creation date
11/15/2018 10:50:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction 2/18/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 2/6/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 3/16/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc 2/25/2025 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction Inc 4/15/2020 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc. 11/4/2020 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> IB. Contractor shall employ and keep on Site on a full time basis personnel experienced in the management of <br /> construction of projects of this size and type. These shall include,but not be limited to, a project manager <br /> I and superintendent. Neither the Contractor's project manager nor the superintendent shall have supervisory <br /> responsibility for other Projects for the Contractor while assigned to this Project. Contractor shall employ <br /> and assign such additional, full time office, support and engineering personnel to support the project <br /> manager and superintendent and allow timely completion of the Project. The project manager and <br /> I superintendent must be approved by the Owner, and such approval shall not be unreasonably withheld. <br /> Contractor acknowledges that one of the instances in which it will be reasonable for the Owner to withhold <br /> consent is if the project manager or superintendent is different than as stated in the Bidder Qualification <br /> I Statement. Contractor shall submit personnel qualifications within ten days of Contractor's execution of <br /> the Contract. Bases for disapproval include, but are not limited to, lack of sufficient experience managing <br /> the construction of similar type or size projects or relationships on other projects unsatisfactory to the <br /> Owner. Owner may require removal and replacement of Contractor's supervisory staff who are disruptive <br /> Ior who appear to lack sufficient competence to complete the Project successfully. <br /> 4.2 Construction Procedures <br /> IA. The Contractor shall supervise and direct the Work and determine the means, methods, techniques, <br /> sequences and procedures of construction, except in those instances where the Owner,to define the quality <br /> of an item of Work, specifies in the Contract, a means, method, technique, sequence or procedure for <br /> construction of that item of Work. <br /> 1 4.3 Subcontractors <br /> A. Unless explicitly specified elsewhere in the Contract Documents or expressly authorized in writing by the <br /> Owner before Contractor submits its Bid, the Contractor shall perform with its own organization at least <br /> I one-third of the Work by dollar volume and Contractor shall not sublet to a single Subcontractor more than <br /> one-half of the Project. A Subcontractor of the Contractor shall not sublet to another Subcontractor more <br /> than one-half of its work without the written consent of the Owner obtained within 20 days of award of the <br /> I Contract to the Contractor. The Owner may refuse to approve such subcontract for any reason. Only unit <br /> price and Schedule of Value items of the Contract will be used in computing the total Work. The Owner <br /> may, at its sole option,refuse to approve a Subcontractor that is also providing services to the Owner on the <br /> same project. <br /> I1. Submit a Request to Sublet Work form for each subcontractor per Section 00 60 00. <br /> B. Subcontractors will be considered agents of the Contractor and their work shall be subject to the provisions <br /> I of the Contract. References in the Contract Documents to actions required of Subcontractors, <br /> manufacturers, Suppliers, or persons other than the Contractor, the Owner or the Owner's Representative <br /> shall be interpreted as requiring that the Contractor shall require such Subcontractor, manufacturer, <br /> ISupplier or Person to perform the specified action. <br /> C. Contractor shall comply with RCW 39.04.250 (1992) and RCW 39.76.011 (1992), as amended, and any <br /> successor and other laws, ordinances, and regulations regarding payment of Subcontractors. Contractor <br /> I shall also comply with the requirements of RCW Chap. 60.28 and any other law, ordinance, or regulation <br /> relating to the release of retainage to Subcontractors. <br /> D. The Contractor shall specifically include in each of its first tier subcontracts the language in this section <br /> with regard to the Subcontractor's obligation to meet bidder responsibility criteria, and shall require each of <br /> its Subcontractors to include substantially the same language of this section in each of their subcontracts, <br /> adjusting only as necessary the terms used for the contracting parties. The requirements of this section <br /> Iapply to all Subcontractors regardless of tier. <br /> I10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> GENERAL CONDITIONS <br /> 00 72 13-15 Issue for Bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.