My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 11/13/2018
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 10:26:57 AM
Creation date
11/15/2018 10:50:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction 2/18/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 2/6/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 3/16/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc 2/25/2025 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction Inc 4/15/2020 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc. 11/4/2020 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. Nothing in these Contract Documents requires the Owner's Representative to provide the Contractor <br /> with direction or advice on how to do the Work, construction practices, or means and methods. If the <br /> ' Owner's Representative approves, suggests or recommends any construction practice, means, method <br /> or manner for doing the Work or producing materials, the approval or recommendation shall not: (A) <br /> guarantee that following the method or manner will result in compliance with the Contract <br /> Documents; (B) relieveby the Contractor of any risks or obligations under the Contract Documents; or <br /> I (C)create any liabilitythe Owner to the Contractor. <br /> 2. Suggestions as to the plans or methods of accomplishing the Work or Contract requirements by the <br /> Owner or the Owner's Representative to the Contractor but not specified or required, if adopted or <br /> ' followed by the Contractor in whole or in part, shall be used at the risk and responsibility of the <br /> Contractor. The Owner and the Owner's Representative assume no responsibility therefor and in no <br /> way will be held liable for any defects in the Work which may result from or be caused by use of such <br /> ' plan or method or Work. <br /> 4.17 Meetings with Owner <br /> ' A. The Contractor shall have its duly authorized representative attend periodic informational meetings with the <br /> Owner's Representative and City staff, as reasonably required by the Owner. <br /> ' B. See Section 01 31 19. <br /> 4.18 Cooperation with Others <br /> A. The Contractor agrees to permit entry to the Site of the Work by the Owner, its employees or other <br /> contractors performing work on behalf of the Owner. The Contractor shall afford to the Owner, other <br /> ' contractors and their employees, reasonable facilities and cooperation and shall arrange its work and <br /> dispose of its materials in such a manner as to not interfere with the activities of the Owner or of others <br /> upon the Site of Work. The Contractor shall promptly make good any Contractor-caused injury or damage <br /> to persons or property that may be sustained by other contractors or employees of the Owner. The <br /> Contractor shall join its work to that of others and perform its work in proper sequence in relation to that of <br /> others. <br /> B. If requested by the Contractor,the Owner will arrange meetings with other contractors performing work on <br /> behalf of the Owner to plan coordination of construction activities. The Contractor shall inform itself of <br /> the planned activities of other contractors and will coordinate its work with the other contractors. <br /> ' C. Contractor shall notify the Owner of problems, interference or any difficulty with other contractors or <br /> workers engaged by the Owner. The Notice shall be sufficiently prompt and specific so as to allow the <br /> Owner to mitigate or avoid increased costs,time of performance,damages or injury. Contractor's failure to <br /> provide such Notice in a timely way shall be deemed a waiver and release of any and all Contract Claims <br /> relating to, arising out of, or caused by, any alleged interference, difficulty or problem with another <br /> contractor or worker engaged by the Owner. <br /> 1 <br /> ' 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> GENERAL CONDITIONS <br /> ' 007213-19 Issue for Bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.