My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 11/13/2018
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 10:26:57 AM
Creation date
11/15/2018 10:50:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction 2/18/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 2/6/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 3/16/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc 2/25/2025 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction Inc 4/15/2020 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc. 11/4/2020 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> B. FORM OF NOTICE <br /> A. The Notice must include the following minimum information: <br /> 1. A complete and accurate description of the event or events giving rise to the Notice, including dates, <br /> times,and locations; <br /> 2. A preliminary list of persons of involved in such event; I <br /> 3, A statement whether the Contractor believes the event may result in a Contract Claim for additional <br /> Contract Time or adjustment of the Contract Sum; <br /> 4. A date by which Contractor shall begin providing Supplemental Information as provided in this <br /> section. <br /> C. SUPPLEMENTAL INFORMATION <br /> A. Contractor shall supplement the written Notice as soon as possible with a written statement providing the <br /> following: <br /> 1. The date of the event, incident, direction,and other pertinent information; <br /> 2. The nature and circumstances giving rise to the Notice; <br /> 3. The Contract provisions relating to,but not limited to,the event,incident, and direction; <br /> 4. The estimated dollar cost, if any, of the Extra Work, or Delay, or both and how that estimate was <br /> determined;and <br /> 5. An analysis of the schedule showing the schedule change or disruption if the Contractor is asserting a <br /> schedule change or disruption. <br /> B. Contractor Records. <br /> I. Throughout any work related to a Notice, the Contractor shall keep complete and accurate records of <br /> costs,expenses, and time incurred for which Contractor will or may seek an adjustment. <br /> 2. Contractor waives and is stopped from seeking an adjustment of Contract Sum or Contract Time <br /> where Contractor fails to keep and maintain cost, timekeeping, and scheduling records segregated and <br /> contemporaneously allocated to the subject work for which an adjustment is sought. <br /> a. For example, failure to keep contemporaneous labor and equipment time records specifically and <br /> only allocated to each item of claimed Extra Work shall constitute a waiver of any Contract <br /> Claim for reimbursement or additional Contract Time for each such item of Extra Work. <br /> b. The Contractor shall permit the Owner access to these and any other records needed for <br /> evaluating requests for additional Contract Time or Contract Sum. <br /> ARTICLE 11 DIFFERING SITE CONDITIONS I <br /> A. GENERAL <br /> A. Notification 1 <br /> 1, Upon discovery and before such conditions are disturbed, the Contractor shall promptly provide <br /> Notice to the Owner's Representative of: <br /> a. Preexisting subsurface or latent physical conditions at the Site differing materially from those <br /> indicated in this Contract, or <br /> b. Preexisting unknown physical conditions at the Site, of an unusual nature, differing materially <br /> from those ordinarily encountered and generally recognized as inhering in Work of the character <br /> provided for in this Contract. <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> GENERAL.CONDITIONS <br /> 00 72 13-48 Issue for Bid I <br />
The URL can be used to link to this page
Your browser does not support the video tag.