Laserfiche WebLink
1 <br /> 1 <br /> SECTION 01 11 20 <br /> JOB CONDITIONS <br /> PART 1 - GENERAL <br /> 1 1.1 SUMMARY <br /> A. Section Includes: <br /> I1Job conditions. <br /> . <br /> B. Related Specification Sections include but are not necessarily limited to: <br /> 1. Division 00-Procurement and Contracting Requirements. <br /> 2. Division 01 -General Requirements. <br /> 1.2 PROJECT CONDITIONS <br /> A. Prior to installation of material, equipment and other work, verify with subcontractors, material <br /> or equipment manufacturers,and installers that the substrate or surface to which those materials <br /> attach is acceptable for installation of those materials or equipment. (Substrate is defined as <br /> building surfaces to which materials or equipment is attached to i.e., floors,walls,ceilings, etc.). <br /> B. Correct unacceptable substrate until acceptable for installation of equipment or materials. <br /> PART 2 - PRODUCTS (NOT USED) <br /> PART 3 - EXECUTION (NOT USED) <br /> END OF SECTION <br /> I <br /> 1 <br /> I <br /> I <br /> 1 <br /> 1 <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> JOB CONDITIONS <br /> 01 11 20-1 Issue for Bid <br />