My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 11/13/2018
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 10:26:57 AM
Creation date
11/15/2018 10:50:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction 2/18/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 2/6/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 3/16/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc 2/25/2025 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction Inc 4/15/2020 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc. 11/4/2020 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> SECTION 01 21 00 <br /> ' ALLOWANCE (LUMP SUM PROJECTS) <br /> PART 1 - GENERAL <br /> 1.1 SUMMARY <br /> A. Section Includes: <br /> 1. Provisions for handling Allowance. <br /> 1.2 ALLOWANCE <br /> A. Allowance(s)are established to provide the Owner with a method for compensating the <br /> ' Contractor for specific items of Work that are not completely defined in the Contract Documents <br /> prior to the award of contract and maybe required to complete the Work. <br /> B. Allowance(s)for minor changes are for the exclusive use of Owner as a result of changed <br /> conditions,design refinements,and unanticipated design issues. <br /> 1. The Owner will issue a field order or directive to proceed with the work as defined in the <br /> Allowance below. <br /> 2. The Owner can compensate the Contractor for the work as defined below without issuing a <br /> change order as long as the costs are within the Allowance amount stated in the Contract. <br /> 3. Owner approval is required prior to the start of the work and/or authorization of progress <br /> payments for the Allowance(s). <br /> 4. The Owner and Contractor can agree to compensate the Contractor for work covered by the <br /> Allowance(s)in one or more of the following methods; <br /> a. Lump sum payment agreed to prior to beginning the work, <br /> b. Agreed on unit prices measured against actual installed quantities, and/or <br /> c. Contractor's actual costs as documented on force account sheets completed daily and <br /> approved by the Owner. Overhead and Profit will be compensated through the <br /> Contractor's Fee as defined in the Contract Documents. <br /> C. Include in the Bid an Allowance equal to$150,000. <br /> 1. Include Allowance sum on Bid Form on the line provided. <br /> 2. The Total Contract Price shall be the sum of the Base Bid and the Allowance plus sales tax <br /> for the sum of Base Bid and Allowance. <br /> 3. At Project closeout and prior to Final Payment,adjust the final Contract Sum accordingly by <br /> Change Order. <br /> a. Amount of the Change Order shall reflect difference between actual costs of all <br /> approved contingency adjustments and the Allowance. <br /> PART 2 - PRODUCTS (NOT USED) <br /> PART 3 - EXECUTION (NOT USED) <br /> END OF SECTION <br /> 1 <br /> I <br /> ' 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> ALLOWANCE(LUMP SUM PROJECTS) <br /> 01 21 00-1 Issue for Bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.