My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 11/13/2018
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 10:26:57 AM
Creation date
11/15/2018 10:50:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction 2/18/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 2/6/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 3/16/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc 2/25/2025 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction Inc 4/15/2020 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc. 11/4/2020 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> C. Transmittal Mechanics: <br /> 1. Follow the transmittal mechanics prescribed for Shop Drawings in Specification Section 01 <br /> 33 0 .Product <br /> a. Product substitution will be treated in a manner similar to "deviations," as described in <br /> Specification Section 01 33 00. <br /> b. List the letter describing the deviation and justifications on the transmittal form in the <br /> space provided under the column with the heading DESCRIPTION. <br /> 1) Include in the transmittal letter, either directly or as a clearly marked attachment, <br /> the items listed in Paragraph D below. <br /> D. Transmittal Contents: <br /> 1. See Section 00 72 13,Part 8.5. <br /> 2. Product identification: <br /> a. Manufacturer's name. <br /> b. Telephone number and representative contact name. <br /> c. Specification Section or Drawing reference of originally specified product, including <br /> discrete name or tag number assigned to original product in the Contract Documents. <br /> 3. Manufacturer's literature clearly marked to show compliance of proposed product with <br /> Contract Documents. <br /> 4. Itemized comparison of original and proposed product addressing product characteristics <br /> including but not necessarily limited to: <br /> a. Size. <br /> b. Composition or materials of construction. <br /> c. Weight. <br /> d. Electrical or mechanical requirements. <br /> 5. Product experience: <br /> a. Location of past projects utilizing product. <br /> b. Name and telephone number of persons associated with referenced projects <br /> knowledgeable concerning proposed product. <br /> c. Available field data and reports associated with proposed product. <br /> 6. Data relating to changes in construction schedule. <br /> 7. Data relating to changes in cost. <br /> 8. Samples: <br /> a. At request of Engineer. <br /> b. Full size if requested by Engineer. <br /> c. Held until substantial completion. <br /> d. Engineer not responsible for loss or damage to samples. <br /> 1.6 APPROVAL OR REJECTION <br /> A. Written approval or rejection of substitution given by the Engineer with consent of Owner. <br /> B. Engineer reserves the right to require proposed product to comply with color and pattern of <br /> specified product if necessary to secure design intent. <br /> C. In the event the substitution is approved,the resulting cost and/or time reduction will be <br /> documented by Change Order in accordance with the General Conditions. <br /> D. Substitution will be rejected if: <br /> 1. Submittal is not through the Contractor with his stamp of approval. <br /> 2. Request is not made in accordance with this Specification Section. <br /> 3. In the Engineer's opinion,acceptance will require substantial revision of the original design. <br /> 4. In the Engineer's opinion, substitution will not perform adequately the function consistent <br /> with the design intent. <br /> E. Reimburse Owner for the cost of Engineer's evaluation whether or not substitution is approved. <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> PRODUCT SUBSTITUTIONS <br /> 01 25 13-2 Issue for Bid , <br />
The URL can be used to link to this page
Your browser does not support the video tag.