My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 11/13/2018
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 10:26:57 AM
Creation date
11/15/2018 10:50:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction 2/18/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 2/6/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 3/16/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc 2/25/2025 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction Inc 4/15/2020 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc. 11/4/2020 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' EXHIBIT A <br /> Substitution Request Form <br /> (One Item per each Form) <br /> FYZ <br /> Project: Date: <br /> Substitution Requestor: <br /> Contractor: <br /> Specification Section No: Paragraph No.(i.e.2.1.A.1.c): Specified Item: <br /> Proposed Substitution: <br /> Provide Product Data Sheets,Manufacturers written installation instructions,drawings,diagrams,or any <br /> other information as an attached to this Form that will demonstrate the proposed substitution is an Approved Equal. <br /> In the lines provided state differences between proposed substitutions and specified item. Differences include but are not limited to interrelationship with other items; <br /> materials,equipment,function,utility,life cycle costs,applied finished,appearances,and quality. <br /> I <br /> In the lines provided demonstrate how the proposed substitution is compatible with or modifies other systems,parts,equipment or components of the Project and Work <br /> under the Contract <br /> In the lines provided,describe what effect the proposed substitution has on dimensions indicated on the Drawings and previously reviewed Shop Drawings? <br /> In the lines provided,describe what effect the proposed substitution has on the Construction Schedule and Contract Time. <br /> In the lines provided,describe what effect the proposed substitution has on the Contract Price. This includes all direct,indirect,impact and delay costs. <br /> I <br /> Manufacturer's guarantees of the proposed and specified items are: <br /> ❑ Same ❑ Different(explain on attachment) <br /> ' The undersigned contractor state's that the function,utility,life cycle costs,applied finishes,appearance and <br /> quality of the proposed substitution are equal or superior to those of the specified item. <br /> (Contractor's Signature) <br /> (Contractor's Firm) <br /> (Date) (Finns Address) <br /> (Telephone) <br /> For use by Project Representative: <br /> ❑ Accepted ❑ Accepted as Noted <br /> (Engineer's Signature) <br /> ❑ Not Accepted ElReceived Too Late <br /> (Owner's Signature) <br /> ' (Date) <br /> Comments: <br /> Copyright 2014 HDR Engineering,Inc. <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> PRODUCT SUBSTITUTIONS <br /> 01 25 13-1 Issue for Bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.