Laserfiche WebLink
1 <br /> D. RFI Submittal Numbering: <br /> 1. RFI's shall be assigned unique numbers in sequential order(1,2,3,4,etc.). <br /> 2. A resubmitted RFI or a previously answered RFI requiring revising or further clarification <br /> shall be submitted using original RFI number proceeded by".1"to indicate revision one of <br /> RFI (i.e.: RFI No. 34.1 for revision 1 to RFI No. 34). <br /> 3. Engineer may return RFI without response for following reasons: <br /> a. Request is unclear or incomplete. <br /> b. Detailed information not provided. <br /> c. Is related to construction means,methods or techniques. <br /> ' d. Is related to health or safety measures. <br /> e. Is due to Contractor's lack of adequate coordination. <br /> f. Is for coordination between Subcontractors. <br /> g. Is considered a"Substitution Request." <br /> ' h. Is considered a"Contractor Proposed Change." <br /> i. Is due to non-conformance. <br /> j. Response is required by another party. <br /> END OF SECTION <br /> I <br /> I <br /> I <br /> i <br /> I <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> REQUESTS FOR INFORMATION(RFI) <br /> 01 26 13-3 Issue for Bid <br />