My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 11/13/2018
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 10:26:57 AM
Creation date
11/15/2018 10:50:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction 2/18/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 2/6/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 3/16/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc 2/25/2025 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction Inc 4/15/2020 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc. 11/4/2020 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> IDOCUMENT 00 22 13—SUPPLEMENTAL INSTRUCTIONS TO BIDDERS <br /> I1.1 GENERAL <br /> A. It is the intent of City to award a contract to the lowest responsive and responsible Bidder. <br /> I Before award, the Bidder must also meet the supplemental bidder responsibility criteria listed <br /> below. <br /> B. Further, the apparent low Bidder and second apparent low bidder must submit the Bidder <br /> Qualification Statement (DOCUMENT 00 45 13) and any other documentation listed below to <br /> the City within one business day after the bid opening, unless the City's project manager, in <br /> writing, allows additional time. <br /> IC. The City reserves the right to require such documentation from other bidders also. <br /> 1 1.2 SUPPLEMENTAL RESPONSIBILITY CRITERIA <br /> I A. Experience <br /> 1. Criteria: <br /> a. The Bidder must have successfully completed at least three Similar Projects within <br /> I the ten years prior to bid opening. <br /> b. The Bidder's superintendent for the Project must have successfully supervised, or <br /> been in a supervisory capacity such as superintendent or site foreman, to <br /> Icompletion at least two Similar Projects within the ten years prior to bid opening <br /> 2. Definition of Similar Project: <br /> I a. A"Similar Project"means a project that meets all of the following requirements: <br /> 1) Awarded total contract value of at least$2,000,000 dollars. <br /> 2) Construction of a significant process mechanical facility (including pumps <br /> I 3) and process equipment) on a wastewater treatment plant. <br /> Coordination of multiple disciplines, including civil, structural, architectural <br /> and electrical elements. <br /> 4) Work with deep foundations and shoring systems. <br /> I3. Documentation: <br /> a. The Bidder shall submit the Bidder Qualification Statement as provided in <br /> I b. Document 00 45 13. <br /> The City may also use independent sources of information that may be available to <br /> demonstrate whether the Bidder is in compliance with these criteria. <br /> 1 4. Evaluation: <br /> a. In evaluating whether these criteria are met, the City may check references for the <br /> I previous projects and may evaluate the project owner's assessment of the Bidder's <br /> performance, including but not limited to the following areas: <br /> 1) Quality control; <br /> I <br /> 2) Safety record; <br /> 10023829 City of Everett Public Works July 2018 <br /> I WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> SUPPLEMENTAL INSTRUCTIONS TO BIDDERS <br /> 00 22 13-1 Issue for Bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.