Laserfiche WebLink
I <br /> 01 75 00 FACILITY START-UP <br /> 01 81 10 WIND AND SEISMIC DESIGN CRITERIA <br /> DIVISION 03 - CONCRETE 1 <br /> 03 05 05 CONCRETE TESTING AND INSPECTION <br /> 03 11 13 FORMWORK <br /> 03 15 19 ANCHORAGE TO CONCRETE <br /> 03 21 00 REINFORCEMENT <br /> 03 31 30 CONCRETE, MATERIALS AND PROPORTIONING <br /> 03 31 31 CONCRETE MIXING,PLACING,JOINTING,AND CURING <br /> 03 35 00 CONCRETE FINISHING AND REPAIR OF SURFACE DEFECTS <br /> 03 41 33 PRECAST AND PRESTRESSED CONCRETE <br /> DIVISION 04 - MASONRY <br /> 04 01 20 MASONRY CLEANING <br /> 04 05 13 MASONRY MORTAR AND GROUT <br /> 04 05 23 MASONRY ACCESSORIES <br /> 04 05 50 COLD AND HOT WEATHER MASONRY CONSTRUCTION <br /> 04 22 00 CONCRETE MASONRY I <br /> DIVISION 05 - METALS <br /> 05 12 00 STRUCTURAL STEEL 1 <br /> 05 21 00 STEEL JOISTS <br /> 05 30 00 METAL DECK <br /> 05 50 00 METAL FABRICATIONS <br /> 05 52 02 ALUMINUM RAILINGS <br /> DIVISION 06 -WOOD, PLASTICS, AND COMPOSITES <br /> 06 10 00 ROUGH CARPENTRY <br /> 06 82 00 FIBERGLASS REINFORCED PLASTIC FABRICATIONS <br /> DIVISION 07 THERMAL AND MOISTURE PROTECTION <br /> 07 16 16 CRYSTALLINE CEMENTITIOUS WATERPROOFING <br /> 07 21 00 BUILDING INSULATION <br /> 07 61 13 METAL ROOFING <br /> 07 62 00 FLASHING AND SHEET METAL <br /> 07 84 00 FIRESTOPPING 1 <br /> 07 92 00 JOINT SEALANTS <br /> DIVISION 08 - OPENINGS I <br /> 08 11 00 HOLLOW METAL DOORS AND FRAMES <br /> 08 15 00 FIBERGLASS REINFORCED PLASTIC(FRP)DOORS AND FRAMES <br /> 08 33 23 STEEL ROLLING OVERHEAD DOORS <br /> 08 68 00 INSULATED STRUCTURAL SKYLIGHT SYSTEM <br /> 08 70 00 FINISH HARDWARE <br /> 08 81 00 GLASS AND GLAZING <br /> 08 90 00 LOUVERS AND VENTS <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> Table of Contents-2 Issue for Bid <br />