My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 11/13/2018
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 10:26:57 AM
Creation date
11/15/2018 10:50:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction 2/18/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 2/6/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 3/16/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc 2/25/2025 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction Inc 4/15/2020 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc. 11/4/2020 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> DOCUMENT 00 31 00-AVAILABLE PROJECT INFORMATION <br /> 1 <br /> 1.1 SUMMARY <br /> ' A. Available Project information has been furnished by Owner for use in designing this Project. <br /> 1. Each Bidder shall be fully familiar with available Project information, which has been prepared <br /> I <br /> 2. for Owner by separate consultants. <br /> Available Project information is offered solely for reference and shall not be considered part of <br /> Contract Documents. <br /> 111 3. Data contained in Documents prepared by Owner's separate consultants is believed to be reliable; <br /> however,Owner and Engineer do not guarantee their accuracy or completeness. <br /> 4. In preparing their Bids, Bidders shall consider and evaluate data contained in available Project <br /> information as well as Contract Documents prepared by Engineer. <br /> i <br /> 1.2 DISCHARGE PERMIT <br /> ' A. A copy of the WPCF discharge permit and fact sheet, which provide water quality and discharge <br /> requirements for the Final Effluent North (FEN) facility, are included as an appendix in the Project <br /> Manual. <br /> B. The permit and fact sheet are provided to indicate water quality requirements of the FEN facility that <br /> must be protected at all times during construction. <br /> 1 1. No activities of the construction process shall violate or inhibit the ability of the WPCF to meet <br /> effluent discharge requirements. <br /> 1.3 SUBSURFACE INVESTIGATION REPORT <br /> A. A copy of a geotechnical report is included as an appendix in the Project Manual, and prepared by HWA <br /> Geosciences, Inc. <br /> B. The geotechnical report identifies properties of below-grade conditions and offers recommendations for <br /> design of foundations, shoring, and structural support for use by the Engineer and Contractor. <br /> C. Recommendations described in report are not requirements of Contract unless specifically referenced in <br /> Contract Documents. <br /> D. Unforeseen Conditions: <br /> I 1. This report,by its nature,cannot reveal every condition existing on Site. <br /> 2. Should subsurface conditions be found to vary substantially from this report, changes in design <br /> and construction of foundations will be made, with resulting changes to Contract Price and/or <br /> Contract Time. <br /> I <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> AVAILABLE PROJECT INFORMATION <br /> ' <br /> 00 31 00-1 Issue for Bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.