Laserfiche WebLink
I <br /> DOCUMENT 00 31 00-AVAILABLE PROJECT INFORMATION <br /> 1 <br /> 1.1 SUMMARY <br /> ' A. Available Project information has been furnished by Owner for use in designing this Project. <br /> 1. Each Bidder shall be fully familiar with available Project information, which has been prepared <br /> I <br /> 2. for Owner by separate consultants. <br /> Available Project information is offered solely for reference and shall not be considered part of <br /> Contract Documents. <br /> 111 3. Data contained in Documents prepared by Owner's separate consultants is believed to be reliable; <br /> however,Owner and Engineer do not guarantee their accuracy or completeness. <br /> 4. In preparing their Bids, Bidders shall consider and evaluate data contained in available Project <br /> information as well as Contract Documents prepared by Engineer. <br /> i <br /> 1.2 DISCHARGE PERMIT <br /> ' A. A copy of the WPCF discharge permit and fact sheet, which provide water quality and discharge <br /> requirements for the Final Effluent North (FEN) facility, are included as an appendix in the Project <br /> Manual. <br /> B. The permit and fact sheet are provided to indicate water quality requirements of the FEN facility that <br /> must be protected at all times during construction. <br /> 1 1. No activities of the construction process shall violate or inhibit the ability of the WPCF to meet <br /> effluent discharge requirements. <br /> 1.3 SUBSURFACE INVESTIGATION REPORT <br /> A. A copy of a geotechnical report is included as an appendix in the Project Manual, and prepared by HWA <br /> Geosciences, Inc. <br /> B. The geotechnical report identifies properties of below-grade conditions and offers recommendations for <br /> design of foundations, shoring, and structural support for use by the Engineer and Contractor. <br /> C. Recommendations described in report are not requirements of Contract unless specifically referenced in <br /> Contract Documents. <br /> D. Unforeseen Conditions: <br /> I 1. This report,by its nature,cannot reveal every condition existing on Site. <br /> 2. Should subsurface conditions be found to vary substantially from this report, changes in design <br /> and construction of foundations will be made, with resulting changes to Contract Price and/or <br /> Contract Time. <br /> I <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> AVAILABLE PROJECT INFORMATION <br /> ' <br /> 00 31 00-1 Issue for Bid <br />