My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3632-18
>
Ordinances
>
Ordinance 3632-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 11:29:59 AM
Creation date
11/15/2018 11:29:55 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3632-18
Date
11/7/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 1 Effective January 1, 2019: <br /> Section 1.1: Water and Sewer System Development Charges <br /> Total Water and <br /> Water System Sewer System Sewer System <br /> Development Development Development <br /> Meter Size Charge Charge Charges <br /> 3/" $3,957 $5,121 $9,078 <br /> 1"domestic/fire* $3,957 $5,121 $9,078 <br /> 1" $6,608 $8,552 $15,160 <br /> 1 1/2" $13,176 $17,053 $30,229 <br /> 2" $21,090 $27,295 $48,385 <br /> 3" $39,570 $51,210 $90,779 <br /> 4" $65,961 $85,367 $151,328 <br /> 6" $131,883 $170,683 $302,566 <br /> 8" $211,021 $273,103 $484,124 <br /> 10" $303,375 $392,627 $696,002 <br /> 12" $445,151 $576,113 $1,021,264 <br /> *Domestic/Fire combination meter for Single Family Residences and Duplexes <br /> reviewed under the International Residential Code, upsized due to the addition of <br /> a fire sprinkler system. <br /> The above table contains charges for inside City limits. Areas outside City limits, <br /> but connected to the City's water and sewer system, shall be charged the inside- <br /> City-limits charge plus a 25% surcharge. <br /> Section 1.2: Stormwater System Development Charge. In addition to water and sewer <br /> system development charges, there shall be a stormwater system development charge <br /> based on square footage of impervious area*: <br /> Development Type Stormwater System Development Charge <br /> New Construction Base Charge(1 ISU 5_2500 sf): $622 <br /> Additional charge for impervious area>2500 sf:$0.2487/sf <br /> Existing <br /> Development adding Calculated per square foot of added impervious surface area <br /> new impervious $0.2487/sf <br /> surface area <br /> ISU=Impervious Surface Unit, defined as 2500 sf of impervious surface area. <br /> * Impervious Area as defined in the Washington State Stormwater Management Manual for <br /> Western Washington <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.