Laserfiche WebLink
3.0 OG'F-SITG ANALYSIS <br /> � Upstrcam l3nsin <br /> As dic[atcd by topography, tl�crc is no upsVeam basin contribuung runoff ro the project sitc. At <br /> thc southcrn property linc oC the site, runoff tends to sheettlow eilher to the west or to the cast <br /> away from the project site. The project sitc on thc west side is completely devcloped and the east <br /> side tends to slope away from thc project site towards A`arbeck Creek. <br /> Downstrcam Busin <br /> As mentioned previously,die downstrcum drainage course for this project site is well documented <br /> by thc City of Lvcrett us there is :m cxisting 12-inch polyethylene pipe discharging from the <br /> project sitc off thc nonh-ccntral portion of thc sitc into a catch basin within thc right-of-way of <br /> Mcaill Crcek Parkway, which discharges ro tlie east into a 48-inch-diamcter dctcntion tank, <br /> which continucs to course easteriy in a 24-inch concrote pipc discharging to a camh basin on the <br /> south side of Mcrrill Creek Parkway where runoff is �hen coursed northwesterly undemeath <br /> Mcrrill Creck Parkway through 18-inch concrete pipe, discharging into a thickly woaled arefi by <br /> an energy dissipater riprap pad, which Narbeck Creek drains from. Narbeck Creek tends to drain <br /> along the eastern side of the project site in a northerly direction ;:nd the sitc dischazges to that <br /> creek on the north side oC Merrill Cmck parktvay. The City is well aware of thc Narbeck Creek <br /> downstream dr�inage coursc from this point. <br /> 3 <br /> ( <br /> 12230.00J.doc <br />