My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3126 HILL AVE EVERETT STEEL CO 2018-01-02 MF Import
>
Address Records
>
HILL AVE
>
3126
>
EVERETT STEEL CO
>
3126 HILL AVE EVERETT STEEL CO 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 11:04:59 AM
Creation date
11/21/2018 11:49:06 AM
Metadata
Fields
Template:
Address Document
Street Name
HILL AVE
Street Number
3126
Tenant Name
EVERETT STEEL CO
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAHONEY & WEBER <br />•'111 •. ,; '•IIU u. 1111IA1 IIIN'.1111II IRlL 1.IP:IryiI1P. , <br />March 24, 1972 <br />Gentlemen: Report of Soils Investigation <br />Proposed Arcweld Facility for <br />Everett Pipe and Steel Co. <br />Everett Washington <br />This report presents the results of our soils investigation for <br />the proposed &-jcwA_-bcL Facility at the site of Everett Pipe and Steel Company's <br />plant in Everett, Washington. The building is located close to the inter- <br />section of 33rd Street and Hill Avenue in Everett, Wash �}gto�`aT)le new <br />construction will consist of a steel frame mill building 9' x �8' in plan <br />dimension with a 200' continuation of the crane rail structure extending to <br />the north. <br />The sub -surface conditions at this site were explored by means <br />of two test pits excavated in tlue positions shown on the attached plot plan. <br />These test pits revealed that the level yard area, which will contain the pro- <br />posed building, is underlain by one to two feet of a slag type fill containing <br />sand and gravel. This is in turn underlain by a stiff clay deposit which extends <br />to at least S feet below the ground surface. No ground water was encountered <br />In the test pits excavated at this site. <br />The general character of the sub -surface conditions around the <br />site area was assessed by conversations with the plant personnel regarding <br />building performance, personal observation of the performance of floor slabs <br />and footing -supported structures and a visit to a nearby construction site <br />to view the sub -surface materials and foundation type used there. All the <br />factors investigated indicate that the site is underlayed by a competent <br />foundation soil of uniform extent, which will provide adequate bearing for <br />shallow foundations.,,.. <br />1 •'I,I aI•.II A hI AV Nnl 11 I I••.I A l 111 WAO IIN.f 11 Ih . YU o4•COIil 201 of PO <br />I n��IA A'i 1 [IAIMNOY NcS 1.16 111 PAIII It WI'11111 I1e5 632 71196 <br />
The URL can be used to link to this page
Your browser does not support the video tag.