My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3126 HILL AVE 8 EVERETT STEEL CO 2018-01-02 MF Import
>
Address Records
>
HILL AVE
>
3126
>
EVERETT STEEL CO
>
3126 HILL AVE 8 EVERETT STEEL CO 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 10:57:17 AM
Creation date
11/21/2018 11:50:32 AM
Metadata
Fields
Template:
Address Document
Street Name
HILL AVE
Street Number
3126
Unit
8
Tenant Name
EVERETT STEEL CO
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOSED CM WORK ORDERS REPORT O POSTING «- i31r <br />Total Utility Maintenance Management Syste <br />09/19/1995 Page 2 <br />Date Range :01/09/1989 - 09/14/1995 <br />CM Work Order Range :1001091070001 - UT2608- - Pattern :7101196648666 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101196648666 (continued) <br />V2117 <br />91 <br />CHEV 1-TON HYD UNIT <br />10.50 <br />58.80 <br />1,72119 <br />91 <br />CHEV 5 YD <br />4.00 <br />45.20 <br />V2213 <br />78 <br />GMC DUMP 10 YARD <br />4.00 <br />68.40 <br />V2231 <br />90 <br />FORD DUMP 5-YARD <br />4.00 <br />21.60 <br />V3502 <br />79 <br />FORD BACKHOE <br />2.00 <br />36.60 <br />VH0003 <br />94 <br />CAT BACKHOE <br />16.00 <br />441.60 <br />Total Vehicle Cost: 694.60 <br />Work Description: <br />---- <br />---------------------------------------------------------------------- <br />METER# 47001142 <br />NORTH OF POWER POLE BETWEEN BAY 2 & 3 DOORS <br />Total cost for work crder 7101196648666: 2032.81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.