Laserfiche WebLink
AGENriv <br /> i.The contract administration will be supervised by the following state of Washington registered Professional <br /> Civil Engineer. <br /> Director, Public Works or City Engineer <br /> Position Title Only <br /> j.Construction administration and material sampling and testing will be accomplished in accordance with the <br /> Local Agency Guidelines. <br /> 3. The agency agrees that they have the means to provide adequate expertise and will have support staff available <br /> to perform the functions being subdelegated. The support staff may include consultant or state services. <br /> 4. The agency agrees that the signature on each project prospectus and local agency agreement will be <br /> consistent with section 2 above. <br /> 5. All projects under Certification Acceptance shall be available for review by the FHWA and the State at any <br /> time and all project documents shall be retained and available for inspection during the plan development and <br /> construction stages and for a three year period following acceptance of the project by WSDOT. <br /> 6. Approval of the local agency certification by the Director of Local Programs may be rescinded at any time <br /> upon local agency request or if, in the opinion of the Director of Local Programs, it is necessary to do so. The <br /> rescission may be applied to all or part of the programs or projects approved in the local agency certification. <br /> 3 ' m <br /> Mayor or Chairperson Date <br /> Washington State Department of Transportation <br /> Approved By: <br /> Director, Local Programs leo ih f eeo7;43, 42t4 S Date <br /> • 4 <br /> ity Clerk <br /> AP!•OVED • TO 0•M <br /> IAMES D.ILES, • <br /> , <br /> DOT Form 140-043 EF <br /> Revised 10/2006 <br />