My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2 State Departments of Fish And Wildlife <br /> 3 <br /> 4 Section 1-07.5(2) is supplemented with the following: <br /> 5 <br /> 6 (April 2, 2018, WSDOT GSP) <br /> 7 <br /> 8 The following Provisions summarize the requirements, in addition to those required <br /> 9 elsewhere in the Contract, imposed upon the Contracting Agency by the Washington <br /> 10 State Department of Fish and Wildlife.Throughout the work, the Contractor shall comply <br /> 11 with the following requirements: <br /> 12 <br /> 13 ***Comply with requirements of the Hydraulic Project Approval (HPA) as included in <br /> 14 Appendix E of these Specifications, including the following requirements: <br /> 15 1. Do not conduct project activities when the work are is inundated by tidal waters <br /> 16 2. Prevent contaminants from the project, such as petroleum products, hydraulic <br /> 17 fluid, fresh concrete, sediments, sediment-laden water, chemicals, or any other <br /> 18 toxic or harmful materials, from entering or leaching into waters of the state. <br /> 19 3. Install an inflatable plug downstream of the work to prevent tidal flows and exclude ' <br /> 20 fish from entering the work area. [The plug shall be installed when runoff from the <br /> 21 work area may enter the existing stormwater system connected to PSO3, <br /> 22 including during connection to the existing drainage pipe. The plug is not required <br /> 23 when all runoff from the work area is be routed to the combined sewer system.] <br /> 24 4. Ensure all catch basins, culverts, energy dissipation devices and pipeline outfalls <br /> 25 are free of obstructions for the life of the project to ensure proper functioning of <br /> 26 the stormwater and combined sewer outfall management system. *** <br /> 2'1 <br /> 28 (April 2, 2018, WSDOT GSP) <br /> 29 All costs to comply with this special provision are incidental to the Contract and are the <br /> 30 responsibility of the Contractor. The Contractor shall include all related costs in the <br /> 31 associated bid prices of the Contract. <br /> 32 <br /> 33 <br /> 34 <br /> 35 1-07.6 Permits and Licenses <br /> 36 <br /> 37 Section 1-07.6 is supplemented with the following: <br /> 38 <br /> 39 (January 2, 2018, WSDOT GSP) <br /> 40 <br /> 41 The Contracting Agency has obtained the below-listed permit(s)for this project.A copy of the <br /> 42 permit(s) is attached as an appendix for informational purposes. Copies of these permits, <br /> 43 including a copy of the Transfer of Coverage form, when applicable, are required to be onsite <br /> 44 at all times. <br /> 45111 <br /> 46 Contact with the permitting agencies, concerning the below-listed permit(s), shall be made <br /> 47 through the Engineer with the exception of when the Construction Stormwater General <br /> 48 Permit coverage is transferred to the Contractor, direct communication with the Department <br /> 49 of Ecology is allowed. The Contractor shall be responsible for obtaining Ecology's approval <br /> 50 for any Work requiring additional approvals (e.g. Request for Chemical Treatment Form). <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 35 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.