Laserfiche WebLink
1 INTRO.AP1 <br /> 2 INTRODUCTION <br /> I3 The following Amendments and Special Provisions shall be used in conjunction with the <br /> 4 2018 Standard Specifications for Road, Bridge, and Municipal Construction. <br /> I 5 <br /> 6 AMENDMENTS TO THE STANDARD SPECIFICATIONS <br /> 7 <br /> 8 The following Amendments to the Standard Specifications are made a part of this contract <br /> II <br /> 9 and supersede any conflicting provisions of the Standard Specifications. For informational <br /> 10 purposes, the date following each Amendment title indicates the implementation date of the <br /> I 11 Amendment or the latest date of revision. <br /> 12 <br /> 13 Each Amendment contains all current revisions to the applicable section of the Standard <br /> 14 Specifications and may include references which do not apply to this particular project. <br /> I 15 <br /> 16 1-02.AP1 <br /> 17 Section 1-02, Bid Procedures and Conditions <br /> 1 18 April 2, 2018 <br /> 19 1-02.4(1) General <br /> I 20 This section is supplemented with the following: <br /> 21 <br /> 22 Prospective Bidders are advised that the Contracting Agency may include a partially <br /> I 23 completed Washington State Department of Ecology (Ecology) Transfer of Coverage <br /> 24 (Ecology Form ECY 020-87a) for the Construction Stormwater General Permit <br /> 25 (CSWGP) as part of the Bid Documents. When the Contracting Agency requires the <br /> I 26 transfer of coverage of the CSWGP to the Contractor, an informational copy of the <br /> 27 Transfer of Coverage and the associated CSWGP will be included in the appendices. <br /> 28 As a condition of Section 1-03.3, the Contractor is required to complete sections I, Ill, <br /> 29 and VIII of the Transfer of Coverage and return the form to the Contracting Agency. <br /> I30 <br /> 31 The Contracting Agency is responsible for compliance with the CSWGP until the end of <br /> 32 day that the Contract is executed. Beginning on the day after the Contract is executed, <br /> 1 33 the Contractor shall assume complete legal responsibility for compliance with the <br /> 34 CSWGP and full implementation of all conditions of the CSWGP as they apply to the <br /> 35 Contract Work. <br /> I 36 <br /> 37 1-02.5 Proposal Forms <br /> 38 The first sentence of the first paragraph is revised to read: <br /> I 39 <br /> 40 At the request of a Bidder, the Contracting Agency will provide a physical Proposal <br /> 41 Form for any project on which the Bidder is eligible to Bid. <br /> I 42 <br /> 43 1-02.6 Preparation of Proposal <br /> 44 Item number 1 of the second paragraph is revised to read: <br /> I 45 <br /> 46 1. A unit price for each item (omitting digits more than two places to the right of the <br /> 47 decimal point), <br /> 48 <br /> I49 In the third sentence of the fourth paragraph, "WSDOT Form 422-031" is revised to read <br /> 50 "WSDOT Form 422-031 U". <br /> IWEST MARINE VIEW DRIVE UTILITIES PAGE 2 OF 60 August 2018 <br /> WORK ORDER#3588 <br /> iWSDOT AMENDMENTS Rev 4/2/18 <br />