My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i1 and VIII completed when provided, and shall be registered as a contractor in the state of <br /> 2 Washington. <br /> I 3 <br /> 4 1-03.5 Failure to Execute Contract <br /> 5 The first sentence is revised to read: <br /> I 6 <br /> 7 Failure to return the insurance certification and bond with the signed Contract as <br /> 8 required in Section 1-03.3, or failure to provide Disadvantaged, Minority or Women's <br /> I 9 Business Enterprise information if required in the Contract, or failure or refusal to sign <br /> 10 the Contract, or failure to register as a contractor in the state of Washington, or failure to <br /> 11 return the completed Transfer of Coverage for the Construction Stormwater General <br /> I 12 Permit to the Contracting Agency when provided shall result in forfeiture of the proposal <br /> 13 bond or deposit of this Bidder. <br /> 14 <br /> I 15 1-05.AP1 <br /> 16 Section 1-05, Control of Work <br /> 17 April 2, 2018 <br /> 1 18 1-05.9 Equipment <br /> 19 The following new paragraph is inserted before the first paragraph: <br /> 20 <br /> I 21 Prior to mobilizing equipment on site, the Contractor shall thoroughly remove all loose <br /> 22 dirt and vegetative debris from drive mechanisms, wheels, tires, tracks, buckets and <br /> 23 undercarriage. The Engineer will reject equipment from the site until it returns clean. <br /> I 24 <br /> 25 This section is supplemented with the following: <br /> 26 <br /> 27 Upon completion of the Work, the Contractor shall completely remove all loose dirt and <br /> 28 vegetative debris from equipment before removing it from the job site. <br /> 29 <br /> I 30 1-06.AP1 <br /> 31 Section 1-06, Control of Material <br /> 32 January 2, 2018 <br /> 1 33 1-06.1(3) Aggregate Source Approval (ASA) Database <br /> 34 This section is supplemented with the following: <br /> I 35 <br /> 36 Regardless of status of the source, whether listed or not listed in the ASA database the <br /> 37 source owner may be asked to provide testing results for toxicity in accordance with <br /> 38 Section 9-03.21(1). <br /> I39 <br /> 40 1-06.2(2)D Quality Level Analysis <br /> 41 This section is supplemented with the following new subsection: <br /> 1 42 <br /> 43 1-06.2(2)D5 Quality Level Calculation — HMA Compaction <br /> 44 The procedures for determining the quality level and pay factor for HMA compaction are <br /> I 45 as follows: <br /> 46 <br /> 47 1. Determine the arithmetic mean, Xm, for compaction of the lot: <br /> I48 <br /> iWEST MARINE VIEW DRIVE UTILITIES PAGE 4 OF 60 August 2018 <br /> WORK ORDER#3588 <br /> IWSDOT AMENDMENTS Rev 4/2/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.