My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 3-01.AP3 <br /> 2 Section 3-01, Production from Quarry and Pit Sites <br /> 3 April 2, 2018 <br /> 4 3-01.1 Description <br /> 5 The first paragraph is revised to read: <br /> 6 <br /> 7 This Work shall consist of manufacturing and producing crushed and screened <br /> 8 aggregates including pit run aggregates of the kind, quality, and grading specified for <br /> 9 use in the construction of concrete, hot mix asphalt, crushed surfacing, maintenance <br /> 10 rock, ballast, gravel base, gravel backfill, gravel borrow, riprap, and bituminous surface <br /> 11 treatments of all descriptions. <br /> 12 <br /> 13 4-04.AP4 <br /> 14 Section 4-04, Ballast and Crushed Surfacing <br /> 15 April 2, 2018 111 <br /> 16 4-04.3(5) Shaping and Compaction <br /> 17 This section is supplemented with the following new paragraph: <br /> 18 <br /> 19 When using 100% Recycled Concrete Aggregate, the Contractor may submit a written <br /> 20 request to use a test point evaluation for compaction acceptance testing in lieu of <br /> 21 compacting to 95% of the standard density as determined by the requirements of <br /> 22 Section 2-03.3(14)D. The test point evaluation shall be performed in accordance with <br /> 23 SOP 738. 111 <br /> 24 <br /> 25 5-01.AP5 <br /> 26 Section 5-01, Cement Concrete Pavement Rehabilitation I <br /> 27 April 2, 2018 <br /> 28 5-01.3(4) Replace Cement Concrete Panel I <br /> 29 The last sentence of the fourth to last paragraph is revised to read: <br /> 30 <br /> 31 If the replacement panel is located in an area that will be ground as part of concrete <br /> 32 pavement grinding in accordance with Section 5-01.3(9), the surface smoothness shall <br /> 33 be measured, by the Contractor, in conjunction with the smoothness measurement <br /> 34 done in accordance with Section 5-01.3(10). <br /> 35 <br /> 36 5-04.AP5 <br /> 37 Section 5-04, Hot Mix Asphalt <br /> 38 April 2, 2018 <br /> 39 5-04.1 Description <br /> 40 The last sentence of the first paragraph is revised to read: <br /> 41 <br /> 42 The manufacture of HMA may include additives or processes that reduce the optimum <br /> 43 mixing temperature (Warm Mix Asphalt) or serve as a compaction aid in accordance <br /> 44 with these Specifications. <br /> 45 <br /> 46 5-04.2 Materials I <br /> 47 The reference to "Warm Mix Asphalt Additive" is revised to read "HMA Additive". <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 11 OF 60 August 2018 <br /> WORK ORDER#3588 <br /> WSDOT AMENDMENTS Rev 4/2/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.