Laserfiche WebLink
1 <br /> 1 5-04.5 Payment <br /> 2 The paragraph following the Bid item "Crack Sealing-LF", per linear foot is revised to read: <br /> 3 <br /> 4 The unit Contract price per linear foot for"Crack Sealing-LF" shall be full payment for all <br /> 5 costs incurred to perform the Work described in Section 5-04.3(4)A. <br /> 6 <br /> 7 5-05.AP5 <br /> 8 Section 5-05, Cement Concrete Pavement <br /> 9 April 2, 2018 1 <br /> 10 5-05.1 Description <br /> 11 In the first paragraph, "portland cement concrete" is revised to read "cement concrete". <br /> 12 <br /> 13 5-05.2 Materials <br /> 14 In the first paragraph, the reference to "Portland Cement" is revised to read: <br /> 15 <br /> 16 Cement 9-01 <br /> 17 <br /> 18 5-05.3(1) Concrete Mix Design for Paving <br /> 19 The table title in item number 4 is revised to read Concrete Batch Weights. <br /> 20 <br /> 21 In item 4a, "Portland Cement" is revised to read "Cement". <br /> 22 <br /> 23 5-05.3(4) Measuring and Batching Materials <br /> 24 Item number 2 is revised to read: <br /> 25 <br /> 26 2. Batching Materials —On all projects requiring more than 2,500 cubic yards of <br /> 27 concrete for paving, the batching plant shall be equipped to proportion aggregates <br /> 28 and cement by weight by means of automatic and interlocked proportioning devices <br /> 29 of accepted type. <br /> 30 <br /> 31 5-05.3(4)A Acceptance of Portland Cement Concrete Pavement <br /> 32 <br /> 33 This section's title is revised to read: <br /> 34 <br /> 35 Acceptance of Portland Cement or Blended Hydraulic Cement Concrete Pavement <br /> 36 <br /> 37 The first sentence is revised to read: <br /> 38 <br /> 39 Acceptance of portland cement or blended hydraulic cement concrete pavement shall <br /> 40 be as provided under statistical or nonstatistical acceptance. <br /> 41 <br /> 42 5-05.4 Measurement <br /> 43 The last paragraph is revised to read: <br /> 44 <br /> 45 The calculation for cement concrete compliance adjustment is the volume of concrete <br /> 46 represented by the CPF and the Thickness deficiency adjustment. 1 <br /> 47 <br /> 48 5-05.5 Payment <br /> 49 The bid item "Portland Cement Concrete Compliance Adjustment", by calculation, and the <br /> 50 paragraph following this bid item are revised to read: <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 15 OF 60 August 2018 <br /> WORK ORDER#3588 <br /> WSDOT AMENDMENTS Rev 4/2/18 <br />