My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 2 Traffic shall not be permitted on the finished concrete until it has reached a minimum <br /> 3 compressive strength of 3,000 psi as verified by rebound number determined in <br /> 4 accordance with ASTM C805 and the longitudinally sawn texture is completed. <br /> 5 <br /> 6 6-09.3(1)B Rotary Milling Machines I <br /> 7 This section is revised to read: <br /> 8 <br /> 9 Rotary milling machines used to remove an upper layer of existing concrete overlay, <br /> 10 when present, shall have a maximum operating weight of 50,000 pounds and conform <br /> 11 to Section 6-08.3(5)B. <br /> 12 <br /> 13 6-09.3(1)C Hydro-Demolition Machines <br /> 14 The first sentence of this section is revised to read: <br /> 15 <br /> 16 Hydro-demolition machines shall consist of filtering and pumping units operating in <br /> 17 conjunction with a remote-controlled robotic device, using high-velocity water jets to <br /> 18 remove sound concrete to the nominal scarification depth shown in the Plans with a <br /> 19 single pass of the machine, and with the simultaneous removal of deteriorated concrete. <br /> 20 <br /> 21 6-09.3(1)D Shot Blasting Machines <br /> 22 This section, including title, is revised to read: <br /> 23 <br /> 24 6-09.3(1)D Vacant <br /> 25 <br /> 26 6-09.3(2) Submittals <br /> 27 Item number 1 and 2 are revised to read: <br /> 28 1 29 1. A Type 1 Working Drawing consisting of catalog cuts and operating parameters of <br /> 30 the hydro-demolition machine selected by the Contractor for use in this project to <br /> 31 scarify concrete surfaces. <br /> 32 <br /> 33 2. A Type 1 Working Drawing consisting of catalog cuts, operating parameters, axle <br /> 34 loads, and axle spacing of the rotary milling machine (if used to remove an upper <br /> 35 layer of existing concrete overlay when present). <br /> 36 <br /> 37 The first sentence of item number 3 is revised to read: <br /> 38 <br /> 39 A Type 2 Working Drawing of the Runoff Water Disposal Plan. <br /> 40 <br /> 41 6-09.3(5)A General I <br /> 42 The first sentence of the fourth paragraph is revised to read: <br /> 43 <br /> 44 All areas of the deck that are inaccessible to the selected scarifying machine shall be <br /> 45 scarified to remove the concrete surface matrix to a maximum nominal scarification <br /> 46 depth shown in the Plans by a method acceptable to the Engineer. <br /> 47 I 48 This section is supplemented with the following: <br /> 49 <br /> 50 Concrete process water generated by scarifying concrete surface and removing existing <br /> 51 concrete overlay operations shall be contained, collected, and disposed of in <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 21 OF 60 August 2018 <br /> WORK ORDER#3588 <br /> WSDOT AMENDMENTS Rev 4/2/18 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.