My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 The last sentence of the second paragraph (after the preceding Amendment is applied) is <br /> 2. revised to read: <br /> 3 <br /> 4 In no case shall the depth of a sawn vertical cut exceed 3/4 inch or to the top of the top <br /> 5 steel reinforcing bars, whichever is less. <br /> 6 <br /> 7 The first sentence of the third to last paragraph is revised to read: <br /> 8 <br /> 9 Where existing steel reinforcing bars inside deck repair areas show deterioration greater <br /> 10 than 20-percent section loss, the Contractor shall furnish and place steel reinforcing <br /> 11 bars alongside the deteriorated bars in accordance with the details shown in the <br /> 12 Standard Plans. <br /> 13 <br /> 14 The last paragraph is deleted. <br /> 15 <br /> 16 6-09.3(7) Surface Preparation for Concrete Overlay 111 <br /> 17 The first seven paragraphs are deleted and replaced with the following: <br /> 18 <br /> 19 Following the completion of any required further deck preparation the entire lane or strip <br /> 20 being overlaid shall be cleaned to be free from oil and grease, rust and other foreign <br /> 21 material that may still be present. These materials shall be removed by detergent- <br /> 22 cleaning or other method accepted by the Engineer followed by sandblasting. <br /> 23 <br /> 24 After detergent cleaning and sandblasting is completed, the entire lane or strip being <br /> 25 overlaid shall be swept clean in final preparation for placing concrete using either <br /> 26 compressed air or vacuum machines. <br /> 27 <br /> 28 Hand tool chipping, sandblasting and cleaning in areas adjacent to a lane or strip being <br /> 29 cleaned in final preparation for placing concrete shall be discontinued when final <br /> 30 preparation is begun. Scarifying and hand tool chipping shall remain suspended until <br /> 31 the concrete has been placed and the requirement for curing time has been satisfied. I <br /> 32 Sandblasting and cleaning shall remain suspended for the first 24 hours of curing time <br /> 33 after the completion of concrete placing. <br /> 34 <br /> 35 Scarification, and removal of the upper layer of concrete overlay when present, may <br /> 36 proceed during the final cleaning and overlay placement phases of the Work on <br /> 37 adjacent portions of the Structure so long as the scarification and concrete overlay <br /> 38 removal operations are confined to areas which are a minimum of 100 feet away from <br /> 39 the defined limits of the final cleaning or overlay placement in progress. If the <br /> 40 scarification and concrete overlay removal impedes or interferes in any way with the <br /> 41 final cleaning or overlay placement as determined by the Engineer, the scarification and <br /> 42 concrete overlay removal Work shall be terminated immediately and the scarification <br /> 43 and concrete overlay removal equipment removed sufficiently away from the area being <br /> 44 prepared or overlaid to eliminate the conflict. If the grade is such that water and <br /> 45 contaminants from the scarification and concrete overlay removal operation will flow into <br /> 46 the area being prepared or overlaid, the scarification and concrete overlay removal <br /> 47 operation shall be terminated and shall remain suspended for the first 24 hours of curing <br /> 48 time after the completion of concrete placement. <br /> 49 <br /> 50 6-09.3(12) Finishing Concrete Overlay <br /> 51 The third paragraph is deleted. <br /> 52 <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 23 OF 60 August 2018 <br /> WORK ORDER#3588 <br /> WSDOT AMENDMENTS Rev 4/2/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.