My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> iINSTRUCTIONS TO BIDDERS <br /> I <br /> 1.0 Design Engineer <br /> 1 Questions and inquiries about these Contract Provisions should be directed to the attention of Erik <br /> Emerson, (425) 257-8995 or eemerson@everettwa.gov. <br /> 2.0 Bidder's Check List <br /> The bidder's attention is directed to the following City-provided forms which must be executed in <br /> full as required and submitted with the bid: <br /> 1. Proposal: The lump sum and unit price items must be shown in the space provided. Show <br /> Iunit prices in figures. <br /> 2. Proposal Signature Sheet: To be filled in and signed by the Bidder. <br /> I3. Subcontractor List: To be filled in by the Bidder. <br /> 4. Local Agency Certification of Federal-Aid Contracts: To be certified by signing the bid <br /> proposal <br /> I <br /> 5. Non-Collusion Declaration: To be submitted with the bid. <br /> I 6. Bid Bond: This form is to be executed by the Bidder and the surety company unless bid is <br /> accompanied by a certified check. The amount of this bond shall be not less than five percent <br /> (5%) of the total amount bid and may be shown in dollars or on a percentage basis. Cash will <br /> I not be accepted. <br /> 7. Proposal for incorporating Recycled Materials into the Project: To be filled out and <br /> Submitted with the Bid. <br /> I Failure to complete the aforementioned forms and to submit said forms with the bid may be due <br /> cause for rejection of bid. <br /> I3.0 Pre-Award Forms <br /> The following form is required to be signed and submitted prior to award of Contract: <br /> I1. Certification of Compliance with Wage Payment Statutes: To be filled in and signed. <br /> This certification is not required to be submitted with the bid proposal and may be submitted <br /> Iwithin 24 hours after bid opening. The Contract cannot be awarded without this certification. <br /> 4.0 Contract Forms <br /> IThe following forms are to be executed after the award of Contract: <br /> 1 1. Contract: This Contract to be executed by the successful bidder in duplicate within twenty <br /> (20) calendar days after the award date. <br /> I <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 1 OF 2 August 2018 <br /> WORK ORDER# 3588 <br /> IDIVISION B <br />
The URL can be used to link to this page
Your browser does not support the video tag.