My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Materials Testing & Consulting Inc 11/20/2018
>
Contracts
>
6 Years Then Destroy
>
2020
>
Materials Testing & Consulting Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2018 11:39:47 AM
Creation date
11/29/2018 11:39:41 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Materials Testing & Consulting Inc
Approval Date
11/20/2018
Council Approval Date
11/14/2018
End Date
12/31/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
On Call Materials Testing
Tracking Number
0001493
Total Compensation
$125,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B.1 <br /> Firm Name: Materials Testing& Consulting, Inc. 2019 & 2020 <br /> Material Testing and Inspection Rates <br /> Testing and Inspection Services Unit Rate <br /> LAB TESTING <br /> Sieve Analysis <br /> Soil/Aggregate Each 85.00 <br /> HMA Mineral Aggregate Each 85.00 <br /> Concrete Aggregate (Coarse & Fine) Each 85.00 <br /> Moisture Density Curve <br /> Proctor Each 125.00 <br /> Sand Equivalent <br /> Soil/Aggregate/Crushed Stone Each 85.00 <br /> HMA Aggregate Each 85.00 <br /> Fracture Face Count <br /> Crushed Stone Each 65.00 <br /> HMA Mineral Aggregate Each 85.00 <br /> Uncompacted Void Content of Fine Aggregate <br /> HMA Mineral Aggregate Each 85.00 <br /> Maximum Theoretical Density (RICE) <br /> HMA Each 90.00 <br /> Ignition Furnace Calibration <br /> Calibrate Furnace prior to Asphalt Content Test Each 25.00 <br /> Asphalt Contect <br /> HMA Each 125.00 <br /> Concrete Testing <br /> Compressive Strength Test Cylinder-Concrete Each 24.00 <br /> Flexural Strength Beam Test Each 25.00 <br /> Field Testing(rates to include; vehicle,mileage, and testing) <br /> Concrete Testing Hour 65.00 <br /> Soil Compaction Testing Hour 60.00 <br /> HMA Compaction Testing Hour 60.00 <br /> Sample Pick Up Aggregate, HMA, Concrete Cylinders Hour 60.00 <br /> Welding Inspection Hour 77.00 <br /> Weld Xray Hour 95.00 <br /> Rebar Inspection Hour 65.00 <br /> Show-Up Time Limited to 2 hours <br /> Miscellaneous <br /> Mileage Mile N/A <br /> Project Management Hour 80.00 <br /> Report Preparation Hour N/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.