My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Krazan & Associates Inc 11/20/2018
>
Contracts
>
6 Years Then Destroy
>
2020
>
Krazan & Associates Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2018 11:43:48 AM
Creation date
11/29/2018 11:43:38 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Krazan & Associates Inc
Approval Date
11/20/2018
Council Approval Date
11/14/2018
End Date
12/31/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
On Call Materials Testing
Tracking Number
0001494
Total Compensation
$125,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B.1 <br /> =� = <br /> � � azan 2019-2020 Fee Schedule - City of Everett <br /> �". KA No. M16011 WAL <br /> Laboratory Services <br /> Specialized Services Are Available On Request <br /> . ': Aggregates and Soils <br /> Absorption(ASTM C127,C128;AASHTO T84,T85) $125.00 each <br /> Abrasion(L.A. 100&500 cycles),(ASTM C131,C535;AASHTO T96) $300.00 each <br /> Atterberg Limits(ASTM D4318;ASHTO T89 and T90) $150.00 each <br /> Accelerated Expansion(CRD 148) $400.00 each <br /> California Bearing Ratio(CBR-includes Proctor)(ASTM D1883;AASHTO T193) $600.00 each <br /> Clay Lumps and Friable Particles(ASTM C142) $150.00 each <br /> Coal and Lignite(ASTM C123) $125.00 each <br /> Consolidation Test(ASTM D2435 test includes 5 loads) $600.00 each <br /> Consolidation Additional Loads $200.00 each <br /> Degradation of Aggregate(WSDOT T113) $250.00 each <br /> Direct Shear Test(ASTM D3080)(Unconsolidated,Undrained,3 point) $350.00 each <br /> Durability Index(ASTM D3744,AASHTO T210) $250.00 each <br /> Dust Ratio-After Sieve Analysis(WSDOT 9-00.5) $40.00 each <br /> Expansion Index/Swell Test(ASTM D4829) $200.00 each <br /> Fertility Analysis(Subcontract) $200.00 each <br /> Flat and Elongated Particles,(CRD C-119,WSDOT FOP-ASTM D4791) $150.00 each <br /> Fractured Faces(Aggregate/Crushed Stone&HMA Mineral Aggregate)(ASTM D5821,WSDOT/AASHTO T335) $100.00 each <br /> Hydrometer Analysis(ASTM D422,AASHTO T88) $200.00 each <br /> Light Weight Pieces(ASTM C123) $150.00 each <br /> Material Finer than No.200 Sieve(ASTM C117) $80.00 each <br /> Maximum Density-Granular Materials(WSDOT T606) $500.00 each <br /> Moisture Content-Aggregates and Soils(ASTM D2216,AASHTO T255,T265) $25.00 each <br /> Moisture Content and Dry density(Liner Sample) $30.00 each <br /> Moisture-Density Relations(ASTM D698,D1557;WSDOT/AASHTO T99,T180) $225.00 each <br /> Modulus of Rupture $175.00 each <br /> Modulus of Elasticity $200.00 each <br /> Organic Content,Loss by Ignition(ASTM D2974) $150.00 each <br /> Organic Content,(Quick Method)Loss by Using Muffle Furnace $50.00 each <br /> Organic Impurities(ASTM C40;AASHTO T21) $80.00 each <br /> Permeability,Constant Head(ASTM D2434) $450.00 each <br /> Permeability Using Flexible Wall Permeameter(ASTM D5084) $650.00 each <br /> Permeability Sample Remold $75.00 each <br /> Potential Reactivity,Chemical Method 3 Determinations(ASTM C289) $1,000.00 each <br /> Potential Reactivity,Mortar Bar Method(ASTM C227) $500.00 each <br /> Proctor Value(ASTM D698,D1557;WSDOT/AASHTO T99,T180) $200.00 each <br /> Relative Density Max-Min(ASTM D4253) $300.00 each <br /> "R"(Resistance)Value(WSDOT 611) $200.00 each <br /> "R"(Resistance)Value,Lime Treated or Requiring Recombining of Aggregates $350.00 each <br /> Resistivity(Fine Soils) $225.00 each <br /> Resistivity(Coarse Soils) $500.00 each <br /> Sand Equivalent(Soil/Aggregate/Crushed Stone&HMA Aggregate)(ASTM D2419;AASHTO T176) $125.00 each <br /> Saturated/Dry Loose Unit Weight $80.00 each <br /> Exhibit B.1 -Page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.