My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
952 N BROADWAY ROYAL MOTOR INN 2018-01-01 MF Import
>
Address Records
>
N BROADWAY
>
952
>
ROYAL MOTOR INN
>
952 N BROADWAY ROYAL MOTOR INN 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2018 9:26:38 AM
Creation date
12/3/2018 9:19:07 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
952
Tenant Name
ROYAL MOTOR INN
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Meg Haley <br />From: Meg Haley <br />Sent: Monday, March 19, 2007 9:43 AM <br />To: 'jhousand@sirconstruction.com' �p7� �U�,L <br />Cc: 'jfp@pacengtech.com' <br />Subject: 952 North Broadway Requirements for Permit <br />Jayme, <br />We have receive the engineering report for 952 North 8roadway vehicle damage From Pacitic Engineering Technologies, <br />Inc. signed and stamped by James Paustian, P.E. and S.E. The report was distributed to Comhusker!nc��rance <br />Companies and the City of Everett. Since the report is noted for excusive use by Cornhusker, you should contact them or <br />Jim Paustian for a copy of the report if you are going to submit the application for building permit(s). <br />A'Stop Work' was issued on 2/13 since permits are required for the type of work involved. In regards to the ceiling repair <br />of the first and second floor units, once the floor ceiling or roof ceiling caviry is exposed, insulation is required to Ne <br />installed whether the insulation was pre-existing or not, per the 2004 Washington State Energy Code Section 101.3.2.5, <br />exception 2. Additional requirements will apply to the work, including the 2003 International Fire Code regarding <br />retroactive requirements for detection systems (IFC Section 907.3) and the 2003 Washington State Ventilation and Indoor <br />Air Quality Code (Section 302) regarding venting. The individual rooms require a one hour separation at the Boor-ceiling <br />assembty, based on the R-2 occupancy, per the 2003 International Building Code Section 711.3. <br />More specific review of the work being proposed can be given once we have received the building permit application and <br />drawings for the new work, showing the existing conditions and any demolition involved, per the City of Everett Tenant <br />Improvement Checklist that you and I discussed at the counter this past Friday. Based on the square footage of the <br />buiiding and the details required to comply with the codes, a Washington State licensed engineer or architect will be <br />required to submit and stamp the drawings. <br />I spoke to Jim Paustian regarding the engineering report, and gave him your contact information if you would like to make <br />arrangements to get a copy. Mr. Paustian was aware of the requirement for a licensed engineer or architect to submit the <br />drawings, per his conversations with Tony Lee, City of Evereri Permit Services Manager. Tony issued the stop work order <br />on the project on February 13, 2007. According to the City of Everett inspection report, the work required for permit is a <br />result from car damage in February and water damage from the December �amage to the roefing materials. <br />Please let me know if you need any additional information prior to submitting the permit applications with the drawings. <br />—Meg <br />Meg��{a�y <br />�la.r�a� �x.a-+ni.ner <br />Ciry of Everett <br />3200 Cedar S�met <br />EverMt, WA 98201 <br />Ph: 725-257�8813 <br />Faz: 425-257-8656 <br />www.eve retiwa.orafdefaul t. as px 71 D=376 <br />
The URL can be used to link to this page
Your browser does not support the video tag.