Laserfiche WebLink
CONVEYANCE DESIGN SUMMARY <br /> The proposed storm drain system is designed to convey surface runoff from the Everett <br /> Community College east parking lots,the !TC and surrounding area,. For sizing the lower part'€ <br /> the line,a future expansion area was assumed east of Broadway Ave(See Assumed Future <br /> Expansion Map). The pprkirg lots are divided int°two basins,designated A and B,which both <br /> currently discharge to Broadway rive. (see Current Conditions Map). The proposed storm drain <br /> system is designed to convey the.24hr,25yr storm evert which has a rainfall depth of 2.60 inch <br /> as defined in the COE Stormwater Management Manual. A peak runoff rate for each basin was, <br /> calculated with Waterworks st ttware l: ing the SBU I method. The Waterworks calculations art- <br /> included <br /> in Appendix A and ars:summarized below_ <br /> basin Peak Flow <br /> Parking Lot Basin A (3.1 AC) 1.8cfs <br /> Parking Lot Basin B (3.3 AC) 1.9cfs <br /> ITC Roof and Surrounding Area(1.8 AC) C.).7cfs <br /> Future Expansion—East of Broadway Ave. 3.5cfs <br /> The piles were sized to convey the 25yr runoff without exceeding 9f%capacity, A 12 inch pipe <br /> is adeguae to convey the runoff from the parking lots and ITC are... The line was upsized to an <br /> 18 inch along Tower St.to facilitate the possible future expansion f the college east of <br /> Broadway Ave(See Pipe Capacity Spreadsheet). <br /> Everett Community Colle February . 01 <br /> Stormwater Hydraulics Repot -6- Reid Jlsddiefali'' <br />