Laserfiche WebLink
Appendices <br /> Appendix A <br /> Exhibits <br /> Exhibit A-1 Vicinity Map <br /> Exhibit A-2 Existing Conditions Map <br /> Exhibit A-3 Existing Conditions Map 10th Street Parking <br /> Exhibit A-4 Developed Conditions Map <br /> Exhibit A-5 Developed Conditions Map 10th Street Parking <br /> Exhibit A-6 Conveyance Basin Map <br /> Exhibit A-7 Pipe Conveyance Map <br /> Exhibit A-8 Pipe Conveyance Map Offsite <br /> Exhibit A-9 Spill Report Form <br /> Appendix B <br /> Exhibits <br /> Exhibit B-1 Building Site Flow Control Calculations <br /> Exhibit B-2 10th Street Parking Flow Control Calculations <br /> Exhibit B-3 Table 5.4 Design Storm Hyetograph 24-hour Design Storm Totals <br /> Exhibit B-4 Building Site Volume Reduction Calculations <br /> Exhibit B-5 10th Street Parking Volume Reduction Calculations <br /> Exhibit B-6 Building Site Conveyance Calculations <br /> Exhibit B-7 10th Street Parking Conveyance Calculations <br /> Exhibit B-8 2001 Reid Middleton"Everett Community College Storm Drainage <br /> Improvements Broadway to Waverly"Report <br /> Exhibit B-9 Preliminary Downstream Conveyance Capacity Analysis Memo <br /> Appendix C <br /> Geotechnical Report <br /> Appendix D <br /> Maintenance and Operations Guidelines <br /> • Construction Erosion Control Maintenance <br /> • Permanent BMP Checklists <br /> • Integrated Pest Management Plan <br /> Everett <br /> Stormwater Site Plan Report OCI0111 <br /> Everettett Community College <br /> Index Hall Replacement&Surface Parking Lot"M" <br /> 209459.10/209459.11 <br />