Laserfiche WebLink
Index Hall Replacement: Building Site Flow Control Calculations <br /> 161 Western Washington Hydrology Model <br /> PROJECT REPORT <br /> Project Name: IHR new <br /> Site Address: <br /> City <br /> Report Date : 1/11/2011 <br /> Gage Everett <br /> Data Start 1948/10/01 <br /> Data End 1997/09/30 <br /> Precip Scale: 1.00 <br /> WWHM3 Version: <br /> PREDEVELOPED LAND USE <br /> Name Basin 1 <br /> Bypass: No <br /> GroundWater: No <br /> Pervious Land Use Acres <br /> C, Lawn, Mod .78 <br /> Impervious Land Use Acres <br /> PARKING MOD 2.08 <br /> Element Flows To: <br /> Surface Interflow Groundwater <br /> Developed Land Use <br /> Name Basin 1 <br /> Bypass: No <br /> GroundWater: No <br /> Pervious Land Use Acres Basin 1 includes Conveyance Area#2. <br /> Impervious Land Use Acres See Conveyance Basin Map(Exhibit A-6) <br /> PARKING MOD 0.1 <br /> Gravel Trench Bed 1 is labeled on the <br /> Conveyance Basin Map as Raingarden <br /> Element Flows To: <br /> Surface Interflow Groundwater <br /> Gravel Trench Bed 1, Gravel Trench Bed 1, <br /> Name Gravel Trench Bed 1 <br /> Bottom Length: 50ft. <br /> 1 B-1 <br />