Laserfiche WebLink
Index Hall Replacement: 10th Street Parking Site Flow Control Calculations <br /> Western Washington Hydrology Model <br /> PROJECT REPORT <br /> Project Name: default <br /> Site Address: <br /> City <br /> Report Date : 12/21/2010 <br /> Gage Everett <br /> Data Start 1948/10/01 <br /> Data End 1997/09/30 <br /> Precip Scale: 1.00 <br /> WWHM3 Version: <br /> PREDEVELOPED LAND USE <br /> Name Basin 1 <br /> Bypass: No <br /> GroundWater: No <br /> Pervious Land Use Acres <br /> Impervious Land Use Acres <br /> PARKING MOD 0.42 <br /> Element Flows To: <br /> Surface Interflow Groundwater <br /> Developed Land Use <br /> Name Basin 1 <br /> Bypass: No <br /> GroundWater: No <br /> Pervious Land Use Acres <br /> C, Lawn, Mod .17 <br /> Impervious Land Use Acres <br /> PARKING MOD 0.25 <br /> Element Flows To: <br /> Surface Interflow Groundwater <br /> 1 B-2 <br />