My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cayenta 11/26/2018 (2)
>
Contracts
>
6 Years Then Destroy
>
2019
>
Cayenta 11/26/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2018 11:12:47 AM
Creation date
12/4/2018 11:12:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Cayenta
Approval Date
11/26/2018
End Date
11/1/2019
Department
Information Technology
Department Project Manager
Dorothy Claymore
Subject / Project Title
Migrate from Troy Check Printing to Cayenta
Tracking Number
0001513
Total Compensation
$13,942.50
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE "A" — SERVICES <br /> Project <br /> City of Everett(CLIENT) has requested HARRIS to: <br /> 1) Replace the current Troy System Accounts Payable (AP) check with a Cognos generated check <br /> • As CLIENT plans to stop using the Troy system <br /> 2) Replace the current Cayenta Payroll check WORD templates with a Cognos check <br /> • As Microsoft has made changes to their Office 2016 Visual Basic code such that WORD <br /> templates are no longer a viable method of achieving the desired business result. <br /> HARRIS will provide the following: <br /> • Install Cognos at Everett <br /> • JIRA CBI-9257 <br /> o Create an AP check <br /> o Create a Payroll check(for use in both regular and manual scenarios) <br /> • The current WORD template has a special function Password Prompt, as well as <br /> a Check and Working copy—see Additional Terms and Conditions below. <br /> CLIENT will provide the following: <br /> • Provide access to Subject Matter Experts (SMEs). <br /> • Configuration <br /> • Testers and testing management required to perform all necessary testing prior to installing into <br /> production. <br /> • Approval prior to promoting any changes to production. <br /> • Sign-off <br /> Constraints and Assumptions <br /> 1) Both HARRIS and CLIENT will ensure staff members are available on dates agreed to and <br /> scheduled. <br /> 2) CLIENT will test and report all incidents via Caystone. <br /> 3) CLIENT will have any new hardware in place before the HARRIS work is scheduled to begin, and <br /> will provide any updated connectivity information for the new hardware (if applicable). <br /> Additional Terms and Conditions <br /> 1) Any workflow or special functions which were previously handled through the templates will be <br /> reviewed on a case-by-case basis to determine if similar functionality can be provided using <br /> Portals or Workflow within the Cayenta Application—Workflow or special functions will increase <br /> the scope of work to be done. <br /> 2) Additional services deemed out of scope (per this document) will be billed at$200 per hour. <br /> 3) All work is remote. <br /> 4) Payment Terms: all fees shall be paid within thirty (30) days of Cayenta's invoice date. All <br /> amounts quoted are exclusive of taxes, which will be billed to the customer if the customer is <br /> not tax-exempt. <br /> 5) No maintenance will be charged on these Cognos reports— but any future adjustments/changes <br /> will be handled underT&M work orders. <br /> PSA betweenCayenta City <br /> Ca enta and of Everett <br /> 8 08/08/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.