Interwest Construction Inc. 11/13/2018 Change Order 5
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 11/13/2018 Change Order 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 8:37:28 AM
Creation date
12/5/2018 8:37:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
11/13/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
5
Tracking Number
0000801
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Act Orig Rem Early Late aeted 2017 2018 2019 <br /> ID Description Dur Dur Start Finish FloTotatl Bud <br /> Resource COgST SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC <br /> 2071 BACKFILL EAST CAP WALLS 1d 14 05JUN19 21AUG19 54d 0 0 <br /> -----� ---r--------------------r - �-_JBACKFILL EAST CAP WALLS <br /> 2075 SUBMIT MARINE VIEW DRIVE PIPE PLAN 0 0 16FEB18A 100 0 SUBMIT MARINE VIEW DRIVE PIPE PLAN <br /> 2080 INSTALL UTILITY LINES THROUGH STRUCTURE 44 0 11JUN18 A 27JUL18 A 100 0 LI 14.-✓'INSTALL UTILITY LINES THROUGH STRUCTURE <br /> 2090 PLACE FOUNDATION WATERPROOFING 3d 0 29MAY18 A 30MAY18 A 100 0 PLACE FOUNDATION WATERPROOFING <br /> 2095 WEST MARINE VIEW DRIVE UTILITY PLAN 0 0 19APR18 A 100 0 .WEST MARINE VIEW DRIVE UTILITY PLAN APPROVED <br /> 2100 COMPLETE MARINE VIEW DRIVE UTILITIES 5d 0 11JUN18 A 02JUL18 A 100 0 COMPLETE MARINE VIEW DRIVE UTILITIES <br /> 3025 BRIDGE SECTIONS DELIVERED TO SITE 0 0 05DEC19 326d 0 0 *BRIDGE SECTIONS DELIVERED TO SITE 1 I <br /> 3030 ASSEMBLE BRIDGE/BR UTILITIES 404 40d 06MAR19 05DEC19 156d 0 0 - ASSEMBLE BRIDGE/BR.UTILITIES <br /> 3050 PAINT BRIDGE 60d 60d 29MAY19 21AUG19 0 0 0 I PAINT BRIDGE <br /> 3060 INSTALL BRIDGE/BRIDGE UTILITIES 104 10d 15MAY19 28MAY19 0 0 0 INSTALL BRIDGE/BRIDGE UTILITIES <br /> 3070 INSTALL STAIRWAY SYSTEM 204 20d 29MAY19 14AUG19 35d 0 0 INSTALL STAIRWAY SYSTEM <br /> 3080 INSTALL BRIDGE DECKS 25d 25d 08AUG19 11SEP19 0 0 0 -1II INSTALL BRIDGE DECI <br /> 3090 INSTALL BRIDGE RAILINGS 30d 30d 12SEP19 3000T19 5d 0 0INSTALL GRID <br /> 3100 INSTALL ELECTRICAL SERVICE AND PANEL 154 11d2h 06AUG18A 020CT19 2694 25 0 -INSTALL ELECTRICAL SERVICE AND PANEL. I <br /> 3150 INSTALL BRIDGE ELECTRICAL 35d 35d 19SEP19 13NOV19 54 0 0 INSTALL BF <br /> 3800 INSTALL HVAC SYSTEM 104 10d 02OCT18 300CT19 269d 0 0 rMLINSTALL HVAC SYSTEM <br /> j <br /> 3810 INSTALL ELEVATOR/CONTROLS 20d 20d 18SEP18' 300CT19 269d 0 0 INSTALL ELEVATOR/CONTROLS <br /> 3815 ELEVATOR INSPECTION AND SIGN OFF 14 14 3000T18 05DEC19 284d 0 0I ELEVATOR INSPECTION AND SIGN OFF <br /> 3820 INSTALL WATERPROOF ROOF SYSTEM 10d 10d 03SEP18' 090CT19 275d 0 0 �,MINSTALL WATERPROOF ROOF SYSTEM(PARTIAL) <br /> 3821 FINISH ROOF SYSTEM 104 104 16OCT18 13NOV19 2694 0 0 -I- FINISH ROOF SYSTEM <br /> 3830 INSTALL CANOPIES,LETTERS.ETC. 10d 104 12SEP19 13NOV19 35d 0 0 ----iyyyy .,INSTALL CANOPIES <br /> 3840 EXCAVATE/GRADE FOR PARK 5d 5d 06JUN19 28AUG19 54d 0 0 EXCAVATE/GRADE FOR PARK IMPROVE <br /> 3850 CONSTRUCT CMU WALL 10d 10d 13JUN19 11SEP19 544 0 0 CONSTRUCT CMU WALE I. <br /> 3860 CONSTRUCT PARK FLATWORK&STAIRS 154 15d 12SEP19 020CT19 0 0 0 CONSTRUCT PAR? <br /> 3870 INSTALL PARK RAILINGS 5d 5d 03OCT19 13NOV19 25d 0 0 INSTALL PARK R. <br /> 3880 INSTALL EAST PATHWAY ELECTRICAL 104 10d 030CT19 13NOV19 20d 0 0 INSTALL EAST F <br /> 3900 INSTALL IRRIGATION SYSTEM 5d 5d 030CT19 090CT19 0 0 0 INSTALL IRRIGAT <br /> 3910 LANDSCAPING 15d 15d 1000T19 300CT19 0 0 0 LANOSCAPIr <br /> 4000 INSTALL WEST LOTUTILITIES 15d 15d 26JUN19 04SEP19 354 0 0 INSTALL WESTLOTUTILITIE1 <br /> 4010 INSTALL WEST PLAZA ELECTRICAL 15d 15d 18JUL19 25SEP19 35d 0 0 +F .INSTALL WEST PLAZA ELECT' <br /> 4020 CONSTRUCT WEST PLAZA FLATW ORK 15d 15d 030CT19 300CT19 5d 0 0 CONSTRUCT I <br /> 5000 PREP AND PAVE HMA 5d 5d 31OCT19 06NOV19 0 0 0 PREP AND <br /> ' <br /> 5010 STRIPING AND SIGNING 5d 5d 07NOV19 13NOV19 0 0 0 STRIPING <br /> 5100 PUNCH LIST 10d 10d 14NOV19 27NOV19 0 0 0 PUNCH <br /> 5150 DEMOBILIZE 5d 5d 28NOV19 04DEC19 0 0 0 DEMC <br /> 5500 PROJECT PHYSICALLY COMPLETE 14 14 05DEC19 05DEC19 0 0 0 PROJ <br /> Start date 04SEP17 MOM Early bar <br /> Finish date 05DEC19 MN Progress bar <br /> Data date 01SEP18 INTERWEST CONSTRUCTION Critical bar <br /> Run date 07SEP18 <br /> Grand Ave Bridge PW3588 Summary bar <br /> Page number 2A <br /> 4, Start milestone point <br /> ©Primavera Systems,Inc. <br /> • Finish milestone point <br />