My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 10/11/2018 Change Order 5
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 10/11/2018 Change Order 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 8:41:29 AM
Creation date
12/5/2018 8:41:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
10/11/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
5
Tracking Number
0000801
Total Compensation
$15,477.91
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> Western States Fire Protection Co. Fire Protection Systems . ,• <br /> Design*Fabrication•Installation <br /> e14690 NE 95th Street,Unit 101 Commercial*Industrial•Residential•Institutional <br /> Redmond, WA 98052 Special Hazards•High Tech Defense•Hangars <br /> (425)881-0100 (425)881-3030 FAX Retrofit•Service•Inspection•Maintenance <br /> CLARIFICATIONS: <br /> 1. Contractor will provide proposed construction schedule with changes as needed. <br /> 2. Contractor will provide at least two weeks' notice if completion date is moved. <br /> 3. Contractor to provide a complete set of Drawing Documents and AutoCAD files at no additional cost for <br /> design submittal. <br /> 4. Contractor to provide Western States Fire Protection Co. with full access to the building for duration of <br /> project. <br /> 5. Contractor will provide job site power for installation purposes. <br /> 6. Adequate time shall be provided for Western States Fire Protection Co. to install all wire and flush mount <br /> devices prior to cover inspection. <br /> 7. Concrete coring will be done by others. <br /> EXCLUSIONS: <br /> 1. Off hours and taxes. <br /> 2. Any and all Concrete Coring <br /> 3. Any and all 120VAC (high voltage) or HVAC work. <br /> 4. Any additional work required by AHJ above and beyond submittal package. <br /> 5. Patching or painting as a result of installation of required devices. <br /> 6. Any and all fire caulking. <br /> This pricing is for work performed between the hours of 7:00am-4:00pm unless otherwise noted above. This pricing <br /> remains in effect for 45 days at which time we have the right to review. <br /> Please contact me if you have any questions or need additional service. <br /> Sincerely, <br /> Western States Fire Protection Company <br /> ./764t <br /> / , <br /> Chase Clements <br /> Electrical Service and Installation Manager <br /> Dallas,TX•Austin,TX•Houston,TX•Albuquerque,NM•Decatur,IL•Denver,CO•Duluth,MN•Kansas City,KS <br /> Las Vegas,NV•Minneapolis,MN•Phoenix,AZ•Portland,OR*Rapid City,SD•Salt Lake City,UT•Seattle,WA•St.Louis,MO <br />
The URL can be used to link to this page
Your browser does not support the video tag.