Project: Grand Avenue Park Bridge <br /> Change Order No.: 7 <br /> Change Order Effective Date: 10-18-2018 <br /> CONTRACTOR <br /> o <br /> By c �Date: 2-2- /e <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> Elevator Paid with City of Everett Local Funds—The dollar amount of foreign steel for the elevator <br /> exceeds the allowable per the Buy America clause in SP 1-06. The City of Everett submitted a Buy <br /> America Waiver Request to WSDOT Local Programs on 12/19/17. The City of Everett was informed <br /> by Local Programs that the WA State Division of FHWA had been notified by the Washington DC <br /> office of FHWA that there was concurrence at the Federal level with the assessment of the inadvertent <br /> discovery of foreign steel in the elevator. As such, the $2.0 million in Federal funds is not at risk and <br /> the City can proceed with Federal participation. This change order moves the cost for the elevator <br /> from Schedule B—Federal participation to a new Schedule C for Local Funds Only. This is a"No- <br /> Cost" change order. <br /> Exhibit B—Additional Contract Time: <br /> This change order adds 0 (zero)working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> Sec attached <br /> Measurement and Payment <br /> Measurement and Payment for the elevator remain the same with the exception of the new Bid Item <br /> number. <br /> ATTACHMENTS(Six Additional Page) <br /> • Existing and New Bid Items <br /> • Email from Shaun Bridge, COE Project Coordinator, dated 10/18/18 <br /> • City of Everett Public Works letter to WSDOT Local Programs, dated 12/19/17 <br /> • Buy America Steel Waiver Design Chronology <br /> Page 3 of 3 <br />