My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 11/13/2018 Change Order 7
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 11/13/2018 Change Order 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 8:45:56 AM
Creation date
12/5/2018 8:45:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
11/13/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
7
Tracking Number
0000801
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Grand Avenue Park Bridge <br /> Change Order No.: 7 <br /> Change Order Effective Date: 10-18-2018 <br /> CONTRACTOR <br /> o <br /> By c �Date: 2-2- /e <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> Elevator Paid with City of Everett Local Funds—The dollar amount of foreign steel for the elevator <br /> exceeds the allowable per the Buy America clause in SP 1-06. The City of Everett submitted a Buy <br /> America Waiver Request to WSDOT Local Programs on 12/19/17. The City of Everett was informed <br /> by Local Programs that the WA State Division of FHWA had been notified by the Washington DC <br /> office of FHWA that there was concurrence at the Federal level with the assessment of the inadvertent <br /> discovery of foreign steel in the elevator. As such, the $2.0 million in Federal funds is not at risk and <br /> the City can proceed with Federal participation. This change order moves the cost for the elevator <br /> from Schedule B—Federal participation to a new Schedule C for Local Funds Only. This is a"No- <br /> Cost" change order. <br /> Exhibit B—Additional Contract Time: <br /> This change order adds 0 (zero)working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> Sec attached <br /> Measurement and Payment <br /> Measurement and Payment for the elevator remain the same with the exception of the new Bid Item <br /> number. <br /> ATTACHMENTS(Six Additional Page) <br /> • Existing and New Bid Items <br /> • Email from Shaun Bridge, COE Project Coordinator, dated 10/18/18 <br /> • City of Everett Public Works letter to WSDOT Local Programs, dated 12/19/17 <br /> • Buy America Steel Waiver Design Chronology <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.