My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 10/18/2018 Change Order 1
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 10/18/2018 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 8:52:16 AM
Creation date
12/5/2018 8:52:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
10/18/2018
Department
Public Works
Department Project Manager
Amie Roshack
Subject / Project Title
Wetmore Avenue Stormwater Bypass Project
Public Works WO Number
UP3704
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0001358
Total Compensation
$38,600.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Project: Wetmore Avenue Stormwater Bypass Project <br /> Change Order No.1 <br /> Change Order Effective Date: October 8, 2018 <br /> JUSTIFICATION <br /> Bid Item #A-2—Traffic Control Labor. This bid item overran plan quantity and is being modified <br /> to account for costs for additional traffic control labor quantities. <br /> New Item #A-101 —Combined Sewer Manhole, Type 1, 72-Inch Diameter. Combined Sewer <br /> Manhole CSMH-04, a 60-Inch Type 1 Manhole, was not large enough to accommodate all pipes <br /> entering and leaving the manhole, so the Contractor's Concrete precast firm recommended upsizing to <br /> a 72-Inch Manhole in order to achieve design parameters. This item is added to account for costs to <br /> pay for a larger combined sewer manhole. <br /> New Item #A-102—Combined Sewer Manhole, Type 3, 72-Inch Diameter. Combined Sewer <br /> Manhole CSMH-05, a 60-Inch Type 3 Manhole, was not large enough to fit all pipes in the manhole <br /> structure. The manhole was upsized to a 72-Inch structure to accommodate all pipes entering into <br /> Manhole CSMH-05. This item is added to account for costs to pay for a larger combined sewer <br /> manhole. <br /> Bid Item #A-13—Combined Sewer Manhole, Type 1, 60-Inch Diameter. Combined Sewer <br /> Manhole CSMH-04 has been upsized to a 72-Inch manhole, so the 60-Inch manhole is no longer <br /> necessary and is being deleted. <br /> Bid Item #A-14—Combined Sewer Manhole, Type 3, 60-Inch Diameter. Combined Sewer <br /> Manhole CSMH-05 has been upsized to a 72-Inch Manhole, so the 60-Inch manhole is no longer <br /> necessary and is being deleted. <br /> Total Cost of Change Order No. 1: $38,600.00 <br /> Contract Time: There are no working days being added to this Contract as part of Change <br /> Order No. 1. <br /> Page 4 of 4 • <br />
The URL can be used to link to this page
Your browser does not support the video tag.