My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3232 OAKES AVE BAKER LEWIS SCHWISOW LAW 2018-01-01 MF Import
>
Address Records
>
OAKES AVE
>
3232
>
BAKER LEWIS SCHWISOW LAW
>
3232 OAKES AVE BAKER LEWIS SCHWISOW LAW 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2018 10:52:32 AM
Creation date
12/6/2018 10:35:18 AM
Metadata
Fields
Template:
Address Document
Street Name
OAKES AVE
Street Number
3232
Tenant Name
BAKER LEWIS SCHWISOW LAW
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�" PETER SCHROEDER ARCHITECT�; <br /> 383848'"AvenueNE Seattle,Washington981G�_ <br /> (206)223 0393 osaaiaCdcomwstnel cell(206)954 0442 <br /> March 26, 2013 <br /> Attn: Meg Haley NCARB <br /> City of Everett <br /> 3200 Cedar Street <br /> Everett,WA 98201 <br /> RE: 3232 Oakes Avenue <br /> Plan Review No. 61211-006 <br /> Ms. Haley, <br /> This letter and sketch address your Fieid Inspection Correc!ion ietter dated 3.20.13 as well as <br /> items discussed in our phone call today, our phone call today. We are now including a powered <br /> door opener on the bath door for accessibility compiiance. <br /> GLNERAL <br /> 1. The walls in Bath-105 where new GWB has been installed are noted on the revised <br /> partial basement plant from drawing A-2. Please note, following my discussions with <br /> the Owner, Chris Baker, only the west and east walls of the bath have received new <br /> GWB. <br /> 2. A new ramp has been included at the new 3'-0" bath door including accessible hardware <br /> and an automated opening device with control switch mounted on the adjacent wall. <br /> The ramp shall be sloped at 1:12. <br /> ACCESSIBILITY <br /> 1. A ramped entry and accessible door and hardware shall be installed to provide access <br /> to the primary function of the bathroom. A powered door opener will be installed with <br /> controls per the attached sketch. <br /> ENERGY <br /> 1. Exposed wall cavities shall be insulated to R-21 and any expc,>ed floor cavities shall be <br /> insulated to R30. None of the existing floor slablcavity will be exposad. <br /> Thanks for assistance. I trust you will contact ma directly if additional information is required. <br /> Sincerely, <br /> Peter Schroeder <br /> Cc Chris liaker, Travis Jensen <br /> Altached sketch dated 3/26/13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.