Laserfiche WebLink
everett <br />e <br />INSPE�.;TION REPORT <br />Address <br />Contract� <br />!�'� 2f � Owner �f' � 1 ��i�-'FT <br />(�Q i 1" � Date ��� <br />1 <br />TYPE OF INSPECTION REQUESTED <br />f7 BLDG: Pmt. No. - p ❑ MECH: PmL No. <br />fr, £LEC: PmL No. _�l�C��4� ❑ PLBG: Pml. No. <br />❑ Temp. Elect. ❑ Framing ❑ Gas Piping <br />❑ Footing ❑ Orywall, Nailing ❑ Consultation <br />❑ Foundation ❑ Shear Nailing ❑ Groundwork <br />O Ductwork ❑ Grid ❑ Struct. Slab <br />❑ Wood Stovo ❑ Rough-In O inal <br />❑ Masonr/ � Service <br />PPROVAL ❑ PARTIAL APPROVAL <br />❑ VIOLATION ❑ CORRECTION REQUIRED <br />f] Correclions listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to peAorm inspection. <br />❑ CALL 259-8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />, <br />Inspector <br />si�i�� )U .��� �� _Date <br />