My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
220 OLYMPIC BLVD T MOBILE ANTENNA 2018-12-07
>
Address Records
>
OLYMPIC BLVD
>
220
>
T MOBILE ANTENNA
>
220 OLYMPIC BLVD T MOBILE ANTENNA 2018-12-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 8:53:13 AM
Creation date
12/7/2018 8:51:44 AM
Metadata
Fields
Template:
Address Document
Street Name
OLYMPIC BLVD
Street Number
220
Tenant Name
T MOBILE ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ri <br />`�,;� � z ' - ^ �: � `r, <br />�` 1 <br />� .,� � . � . '� <br />Date: November 9, 2015 <br />Paul Anzini <br />Crown Castle <br />2055 S. Stearman Dr. <br />Chandler, AZ 85226 <br />602.845.1753 <br />� Subject: Structural Modification Report <br />Carrier Designation: T-Mobile Co-Locate <br />Carrier Site Number: <br />Carrier Site Name: <br />Crown Castle Designafion: <br />Engineering Firm Designation: <br />Sife Data: <br />Dear Paul Anzini, <br />Paut J Ford and Company <br />250 E. Broad Street, Suite 600 <br />Columbus, OH 43215 <br />614.221.6679 <br />rkoors@pjfweb.com <br />SE01685B <br />Masonic Center <br />Crown Castle BU Number: 825709 <br />Crown Castle Site Name: Masonic Center <br />Crown Castle JDE Job Number: 332812 <br />Crown Castle Work Order Number: 1136445 <br />Crown Castle Application Number: 291670 Rev. 6 <br />Pau! J Ford and Company Project Number: 37515-2981.001.7700 <br />220 Olympic Blvd., Everett, Snohomish County, WA <br />Latitude 47° 57'26.273", Longitude -122° 93'S6.064" <br />76 Foot - Monopole Tower <br />Paul J Ford and Company is pleased to submit this "Structural Modification Repoi�t" to determine the <br />structural integrity of the above mentioned tower. This analysis has been performed in accordance with the <br />Crown Castle Structural `Statement of Work' and the terms.of Crown Castle Purchase Order Number 835671, in <br />accordance with application 291670, revision 6, <br />The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we <br />have determined the tower stress level for the structure and foundation, under the followirig load case, to be: <br />LC4.5: Modified Structure w/ Existing + Proposed Equipment <br />Note: See Table I and Table II forthe proposed and existing loading, respectively. <br />Sufficient Capacity <br />This analysis has been performed in accordance with the 2012 International Building Code based upon an <br />ultimate 3-second gust wind speed of 110 mph converted to a nominal 3-second gust wind speed of 85 mph per <br />section 1609.3.1 as required for use in the TIA-222-G Standard per Exception #5 of Section 1609.1.1. <br />Exposure Category B with a topographic category 1 and Risk Category II were used in this analysis. <br />All modifications and equipment proposed in this report shall be installed in accordance with the attached <br />drawings for the determined available structural capacity to be effective. <br />We at Paul J Ford and Company appreciate the opportunity of providing our continuing professional services to <br />you and Crown Castle. If you have any questions or need further assistance on this or any other projects <br />please give us a cal{. � <br />Respectfully submitted by: <br />Bob Koors, E.I. � <br />Structural Designer <br />tnxTower Report - version 6.1.4.1 <br />P�+011 1 � ���� � <br />
The URL can be used to link to this page
Your browser does not support the video tag.