My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
916 PACIFIC AVE BETHANY 2018-01-01 MF Import
>
Address Records
>
PACIFIC AVE
>
916
>
BETHANY
>
916 PACIFIC AVE BETHANY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:43:33 PM
Creation date
12/11/2018 3:18:52 PM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
916
Tenant Name
BETHANY
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. .. ..�.. <br /> i <br /> / �: <br /> + ..�` <br /> o ' <br /> _ : <br /> � 'M+cC � <br /> STAiEOFWASHINGTUN 0 ���U �� <br /> DEPARTMENT OF HEALTH p�r1 � <br /> po. sox u852 • Olympia, Washinafon 98501-7852 31gg8 � <br /> ..... <br /> . F�CITy..OF... <br /> �'�eerin ip FVf <br /> B u61ic eE M�s .. <br /> October 9, 1998 <br /> Bethany of the Northwest <br /> Thomas Gray <br /> 3322 Broadway <br /> Everett WA 98201 <br /> RE: Bethany at Pacific <br /> Conversion of Hospital to Nursing Home <br /> CRS #98-827&5142-007 <br /> Dear Mr. Gray: <br /> We received the Plan Review Response from Riley Engineering, Inc. on September 23, 1996. <br /> The staifs review is pursuant to Chapter 388-97 WAC - Nursing Homes cod'rfied Rules, <br /> Regutadons,and Standards adopted by the department as amended to date for use of the faality. <br /> local building officiais have the authority for review and approval of this construction project <br /> pursuant to the State Building Code adopted by the Iocal jurisdiction as amended to date for <br /> occupancy of the facility. <br /> We still need to receive for epproval Hro derm shop drewinys for floon 3 and 4. 'fhese <br /> drawings may be submitted separately duHng the construction. <br /> We are retuming a set of stamped "Approved" Construction Drawings and Sp6cifications for your <br /> use at the job site. Final approval is subject to applicable codes and field inspections. We <br /> recommend these documents become a permanent part of the facility records. <br /> We heve enciosed 1 notificatlon card(s). Please complete and retum the proen card when <br /> construction begins. The pink csrci and one copy of the Final Inspection Approval from the local <br /> jurisdiction is required when construction is complete. <br /> The Residentiai Care Services Division of the Department of Social and Health Services(DSHS) <br /> requires a minimum 90-day advance notificaHon of anticipated completion dates. Please contact: <br /> Director, Residentiel Care Services, 4413 Woodview Drive S.E., P.O. Box 45600,Olympie, <br /> Washington 98504-5600. At that time you will be given instruction on how to proceed for a timely <br /> opening of your project, including Medicaid and/or Medicere certification. <br /> .� 'r.; • � <br />
The URL can be used to link to this page
Your browser does not support the video tag.