Laserfiche WebLink
(� � �_ ' <br /> Rl�/r //�S' <br /> ApbQ1�1ISTRATIVE ACTION <br /> DATE: August 8, 1997 <br /> SUBJECT: Remodel pf Providence Hospital at Pacific for Bethany <br /> AC1'ION: L Acceptana of existing them�ostats being left at �he present height <br /> (4' - l0"). <br /> 2. Acceptance of the positioning and r:use of existing patient toilets. <br /> FINDINGS: 1. The tenant improvement is not considered a "substantial alteration." <br /> 2. Toilets will be raised to mcet an accessibility requirement. <br /> 1 3. The toilets do not wmply with current water saver standards, but <br /> will provide the higher Flushing power needs of the nursing home. <br /> / <br /> }, <br /> Bui ding fficial <br /> sM:ia:..:ne�h.oy <br /> CITY OF EVERETT•3200 Ceder Stroet•Everett,WA 38201 •(425}257-8800•fex(�25)257-88�6 <br />