Laserfiche WebLink
C � ( <br /> P�I�LK /f��4 ` <br /> ADIYIINLSTRATIVE ACTION <br /> DA1'E: October 27. 1997 <br /> SUBJECf: Bethany Skilled Nursing Facility � Providence Hospital, Pacific Campus <br /> ACfION: Acceptance of the reuse of existing partition constrvction at cortidors <br /> FINDINGS: ' Existing corridor walls aze constructed as follows: <br /> 1" venar plaster work system floor W tloor on the cortidor side, �/:' clips, <br /> 2�/.' wirc studs at 16" o.c. floor to tloor wircd together with 3/�" x 1�i4" <br /> channels at 48" o.c. t, �/;' clips, l" veneer plaster work sysiem 800t to <br /> ceiling+3"on the room side, for a total thickness of 4�/s" t. <br /> ' An additional layer of fire taped S/8" type X GWB will be applied from <br /> the top of the existing venar plaster wotic to the sttucture above on the <br /> room side of the partition at locations wherc the remodel provides xcess <br /> to tho ceiling space. <br /> l� i�— <br /> BU DING OFFICIAL <br /> SM:jtlycltlmay.)1 <br /> CITY OF EVERETT• 3200 Cedar Street• Everen,WA 99201 •(425)257-8800• Fax(425)257-�'.�6 <br />