Laserfiche WebLink
� � ; <br /> Traffic Study performed at: <br /> DoodleBu�Sportz Paintball Park <br /> 9220-172 St NW <br /> Stanwood, WA 98292 <br /> Don Cort, the site operator, perfortned this Smdy between 09/07l02 & 11/30/02. The <br /> study was perfortned to evaluate the trat�ic and parking requirements for the Conditional <br /> Use Pertnit that Mr. Cort was working on obtaining for t6e Paintball Park. <br /> Date Number of Players Vehicles Vehicle Trips <br /> 09/07/02 21 8 16 <br /> 09/Q8/02 25 •(2) 7 14 <br /> 09/14/02 15 7 14 <br /> 09/15l02 11 '(5) 3 6 <br /> 09/28/02 47 16 32 <br /> 09/29/02 9 3 6 <br /> 10/OS/02 l2 4 g <br /> l0/06/03 17'(4) 5 10 <br /> 10/l2/02 50 "(1) l5 30 <br /> 10/13/02 10 '(3) 3 6 <br /> 10/19/02 33 12 24 <br /> 10/20/02 1� 8 �6 <br /> 10/26/02 40 10 20 <br /> 10/27/02 18 7 l4 <br /> 11/02/02 19 6 12 <br /> i l/09/02 l0 4 8 <br /> 11/11/02 18 3 6 <br /> 11/23/02 40 12 24 <br /> ll/30/02 20 9 18 <br /> Company Van'1 19 38 <br /> Total 432 '(15) i53 322 <br /> 322 Toml vehicle trips to and from site. <br /> 19 O�eratin¢davs. <br /> 16.9 Average vehicle trips. <br /> •1-Company step van was driven to the site for 19 days of gaming. Employces were <br /> transpocted to the site in ihe van. <br /> • Players that artived by means other than automobiles. These players eitfKr walked or <br /> rode bicvcles. <br /> �3 <br />