Laserfiche WebLink
CITY OF EVERETT <br />CONSTRUCTION PERMIT SUBMITTAL CHECKLIST <br />FOR: <br />NEW COMMERCIAL, INDUSTRIAL AND <br />MULTI -FAMILY (GREATER THAN 2 UNITS) PROJECTS <br />Complete checklist in ink. Fees: The plan check fee is due when permit application is made; <br />the permit fees are paid when the permit is issued. This checklist must accompany a <br />completed permit application. <br />I. BUILDING DESCRIPTION <br />A. Use of building . <br />Use (i.e. restaurant, 'office, etc.) SGYil,4t, SEFV16t�3 <br />_ V B. Construction materials within building (wood, steel, concrete, etc) <br />CoN cP-r-7-F I WOOD F3t-AT S/ r �X6 K/ W M4e—POA) <br />C <br />Building floor area (U.B.C. Section 407 "floor area" (if multiple floors indicate <br />floor area of each floor) <br />1610 g ow Wales) <br />1st Floor sf CVF WM4� <br />2nd Floor sf <br />3rd Floor <br />_ D. Indicate if the building will be equipped with an automatic fire suppression <br />system (fire sprinkler system). Please refer to City of Everett Ordinance No. <br />1902-92. <br />Yes <br />No _ <br />Partial—__z <br />✓ E. Number of off-street parking spaces provided <br />Describe below any other information which may assist the plans reviewer in processing the <br />permit application. <br />nrpennck (3117193) <br />