Laserfiche WebLink
Seattle <br />Bothell <br />Tacoma <br />Sumner <br />Peninsula <br />Portland <br />One Lab. <br />One Consultant. <br />One solution, <br />fortNM ON/i/on <br />11824 N Creek PkwV N <br />Sufb 101 <br />aof"#,, WA 96071 <br />U.S.A. <br />7o1. 1706/ 483.42 a <br />fNx: 1206/ 466.16 r r <br />ID:4^ci-dull <br />Pacific <br />Tpsting <br />Laboratories <br />March 13, 1996 <br />Certificate No. 9508.6850 <br />COCOON HOUSE <br />2726 Cedar Avenue <br />Everett, WA 98201 <br />11RP. 1311-1f-. 17:0_• t4o.020 P.02" <br />WORN <br />MAR 141996 D <br />CITY OF. EVERE'Tr...... <br />8• Permit Courr01. <br />T <br />Attention: Sarii Gilman <br />Subject: Project Name: Cocoon Complex <br />Project Address: T9z`12931 Pine <br />Permit No: B44903 <br />We have completed the requested special inspections on the subject project. Our final <br />report, dated 03/12/96. is numbered FR2358. <br />WORK REQUIRED WORK INSPECTED <br />Reinforced Concrete <br />Reinforced Masonry <br />Roof Nailing <br />Reinforced Concrete <br />Reinforced Masonry <br />Roof Nailing <br />To the best of our knowledge, all work inspected conformed to approved plans, <br />specifications, UBC, and related codes, and/or verbal or written instructions from the <br />Engineer of Record. <br />Reviewed by: Jeffrey S. Mercer, Manager, Easiside Division) <br />Sincerely, <br />ames C. Fr ing, P.E., Presid i <br />1CFhmn I <br />cc: CITY OF EVERETT BUILDING DEPARTMENT <br />