Laserfiche WebLink
O WATTS BACKFLOW DEVICE MODELRPZ 909 1 " NPT. <br /> � B O 1/2" ASCO SOLENOID VALVE 2WAY # 8210G94 <br /> , O WATTS PRESSURE REDUCING VALVE 1/2" # U5B 25 - <br /> 75 OPERATING PRESSURE <br /> � / O VAL�ERASET BORTS MRNUOR COCTIVA�TIO�NFPERODo3D CONSTRUCTI0 �1 NOTES <br /> = B <br /> � TIMES A DAY INTERMATIC T10�. � REMOVE PROCESS WATER COOLING PIPING <br /> > � BETWEEN AHU COIL AND POINT OF CONNECTION <br /> � <br /> NEAR BACKFLOW PREVENTER. COORDINATE WITH <br /> � 2 � � � � NEW WORK. <br /> 1 " CW � <br /> WATER � � 3�4�� 2,- CAP PIPE. <br /> � <br /> � ROUTE DWN IN ENSIFIER <br /> � COLUMN 9R <br /> , MILWAUKEE GLOBE VALVE <br /> � � O i 15� LBS, #1590T <br /> � IMER <br /> u — r� <br /> 2 1/2 4 5 1 1 Os 3 1 /2" FLUSH TO FLOOR SINKS <br /> '�- BV3 „ �I BFP I� �I� I�+I�—► <br /> � HB .� <br /> BFP TP� 1/2" HB ��� 3/4" TO BOOST P U M PS <br /> " 2 � 1 /2" TUBING TO FLOOR DRAIN <br /> P �UMBING DETAIL � PLUMB �JG DETAI � �� HYDRON C P P �1G DETAI � � <br /> SCALE: NONE 1 M 110-10a SCALE: NONE 1 M 110- 14 SCALE: NONE 1 M210-35 <br /> �� �� �� <br /> �� �� <br /> , ii ii BUSHING <br /> u ii <br /> ii n <br /> VACUUM PUMP i� AIRFLOW ii <br /> WLET PIPWG ii ii <br /> ii n <br /> ii n <br /> �i ii <br /> SWIVEL �� i� FLEXIBLE <br /> ii ' HOSE <br /> CONNECTOR ii i <br /> ii ii <br /> �ii ii-� <br /> r--J II II �--� �/^�+ <br /> I II II I �f <br /> L___1L__--___— _______1L___J . <br /> " NOZZLE <br /> BALANCING SOLENOID -@, <br /> VALVE <br /> VALVE P ISOLATION VALVE <br /> 1/2" PIPE <br /> S NIPPLE, TYP. <br /> � � <br /> FLOW <br /> , INDICATOR ' <br /> STR,4INER <br /> FLOW GLOBE <br /> - SWITCH VALVE ' <br /> � VACUUM PUMP WATER INJECTION SYSTEM <br /> PLUMBING DETA L 4 <br /> SCALE: NONE M463 <br /> � <br /> � ��a me � <br /> �. ��,�n , �2Q� vw.viii ry � <br /> ' ' � � �°� <br /> G R O U P <br /> 600 Stewart St., Ste 1400 <br /> Seattle, Washington 98101 � <br /> ISSUED FOR PERMIT Tel 206.267.1700 <br /> �7. � 8. � 7 , Fax 206.267.1701 , <br /> � SAZAN # 500-1775 <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE '�a ACCEPTABILITY DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> ���� PLUMBING DETAILS W2572915 B 07.18.17 <br /> A IRC — wBS 2.2.3.3.2 HD vaCUUM PUMP RM — RECORD DwG W2572915 SAZAN KLW 07.15.16 � oF h , THIS DESIGN AND/OR CHECKED <br /> ���� ��1sN`��go� SPECIFICATION IS APPROVED SHEET <br /> B IRC — WBS 2.2.3.4.4 VACUUM PUMP WATER RECYCLE W2572915 SAZAN 07.18.17 BOE,�� � �J £n � , �z� N �N TITLE IRC - WBS 2.2.3.4.4 VACUUM PUMP WATER RECYCLE <br /> '� � E,s�.�1 APPROVED BY DEPT. DATE M 6 3 0 R <br /> ;•% l�� �. �'� .� ".:.r CHECKED <br /> � 31�?, ` BUILDING 4�-056 <br /> ����JI�Nf1L¢�'����' APPROVED JOB Na W2572915 COMP N0. ' <br /> �s� <br /> 07/17/2017 APPROVED MECHANICAL MASTER EVERETT, Wq °wc No. 40-056=M630R <br />