Laserfiche WebLink
downstream drainage system are anticipated with the development of Stadium Flowers <br /> site. <br /> Requirement#5-Onsite Stormwater Management <br /> The project will provide tightlined connections at all downspouts locations. A solid 6" <br /> PVC pipe will direct runoff from the downspouts to the existing catch basin found in the <br /> Broadway R/W. No flooding or erosion impacts are anticipated with the development of <br /> this site. Existing CB in Broadway drains to curb- not connected to combined sewer. <br /> Tight-line to combined Sewer will not be allowed. <br /> OPERATION AND MAINTENANCE <br /> Maintenance of the downspouts and conveyance system should be on a yearly basis. <br /> Pipes and yard/or catch basins that have more than 2 inches of sediment should be <br /> cleaned regularly. <br />