My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3620 BROADWAY VERIZON 2019-01-11
>
Address Records
>
BROADWAY
>
3620
>
VERIZON
>
3620 BROADWAY VERIZON 2019-01-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 11:15:42 AM
Creation date
12/20/2018 2:31:04 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3620
Tenant Name
VERIZON
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Existing Impervious <br /> Ex. Building = 1,285 sf(prior to demolition) <br /> Ex. Pavement =4,819 sf <br /> Total = 6,104 sf <br /> Proposed Impervious <br /> Proposed Building = 3,800 sf <br /> Proposed Parking/DW = 3,058 sf <br /> Proposed Sidewalk = 490 sf <br /> Total = 7,348 sf <br /> Note: New Impervious Surface=7,348 sf—6,104 sf= 1,244 sf <br /> MR2 SWPPP NARRATIVE <br /> I. Elements <br /> A Construction Stormwater Pollution Prevention Plan(SWPPP) needs to have <br /> construction plans and drainage report as part of the full or targeted drainage plan. The <br /> drainage report will have a section that discusses the 12 elements as they apply to the <br /> project. <br /> The 12 elements that are part of a construction SWPPP are as follows: <br /> 1. Mark Clearing Limits: <br /> The clearing limits will be marked with silt fences near the limits of work. <br /> 2. Establish Construction Access: <br /> Construction entrance will utilize the existing driveway accesses. <br /> 3. Control Flow Rates: <br /> The site is quite permeable. The work will take less than four months and then replanted <br /> with grass/hydroseeded. No flows are anticipated to be detained other than the silt fences <br /> and that is a filtering process. <br /> 4. Install Sediment Controls: <br /> Prior to construction, erosion control measures are required to be installed. These will <br /> include straw bale barriers, silt fence and limited sediment traps. <br /> 5. Stabilize Soils: <br /> The soils are Alderwood-Urban land complex that is suitable for temporary dispersal of <br /> runoff on-site. From October 1 through April 30, no soils shall remain exposed and <br /> unworked for more than 2 days. Hydroseeding or hand-sowing after construction will be <br /> conducted and mulching with straw on the disturbed areas. <br />
The URL can be used to link to this page
Your browser does not support the video tag.