Laserfiche WebLink
Existing Impervious <br /> Ex. Building = 1,285 sf(prior to demolition) <br /> Ex. Pavement =4,819 sf <br /> Total = 6,104 sf <br /> Proposed Impervious <br /> Proposed Building = 3,800 sf <br /> Proposed Parking/DW = 3,058 sf <br /> Proposed Sidewalk = 490 sf <br /> Total = 7,348 sf <br /> Note: New Impervious Surface=7,348 sf—6,104 sf= 1,244 sf <br /> MR2 SWPPP NARRATIVE <br /> I. Elements <br /> A Construction Stormwater Pollution Prevention Plan(SWPPP) needs to have <br /> construction plans and drainage report as part of the full or targeted drainage plan. The <br /> drainage report will have a section that discusses the 12 elements as they apply to the <br /> project. <br /> The 12 elements that are part of a construction SWPPP are as follows: <br /> 1. Mark Clearing Limits: <br /> The clearing limits will be marked with silt fences near the limits of work. <br /> 2. Establish Construction Access: <br /> Construction entrance will utilize the existing driveway accesses. <br /> 3. Control Flow Rates: <br /> The site is quite permeable. The work will take less than four months and then replanted <br /> with grass/hydroseeded. No flows are anticipated to be detained other than the silt fences <br /> and that is a filtering process. <br /> 4. Install Sediment Controls: <br /> Prior to construction, erosion control measures are required to be installed. These will <br /> include straw bale barriers, silt fence and limited sediment traps. <br /> 5. Stabilize Soils: <br /> The soils are Alderwood-Urban land complex that is suitable for temporary dispersal of <br /> runoff on-site. From October 1 through April 30, no soils shall remain exposed and <br /> unworked for more than 2 days. Hydroseeding or hand-sowing after construction will be <br /> conducted and mulching with straw on the disturbed areas. <br />