My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
801 E CASINO RD 2019-02-01
>
Address Records
>
E CASINO RD
>
801
>
801 E CASINO RD 2019-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 7:36:13 AM
Creation date
12/21/2018 7:25:37 AM
Metadata
Fields
Template:
Address Document
Street Name
E CASINO RD
Street Number
801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25JUL 2011, <br /> PUBLIC WORKS PERMIT Date: 4/7/2017 <br /> City of Everett Public Works Department Public Works Permit#: PW1704-007 <br /> 3200 Cedar Street Parent Permit#: PW1706-048 <br /> Everett, WA 98201 Planning Reference#: <br /> (425)257-8810 <br /> Public Works Fee$: $ 385.00 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> EVERETT SCHOOL DIST DA HOGAN &ASSOCIATES INC <br /> 3900 BROADWAY 119 FIRST AVE S, STE 110 <br /> EVERETT WA 98201 SEATTLE WA 98104 <br /> PHONE: 4253854198 PHONE: 2062850400 <br /> TAX PARCEL ID# 28050700301100 SITE ADDRESS: 801 E CASINO RD <br /> PHASE 2-REPLACE EX GRASS FIELD WITH SYNTHETIC TURF <br /> CASCADE HIGH SCHOOL <br /> Phase 2 Permit for replacement field work. Existing field was underdrained grass, new field will be synthetic turf. <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works <br /> Department dated 7/19/2017. <br /> 5. Contact the City of Everett Public Works Inspector Jim Knappert at 425-339-7404 <br /> prior to starting construction and with other inspection requests. [�I <br /> 6. Install erosion control measures per plan & City of Everett Standards, and remove Cf) <br /> completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto <br /> roadway. O <br /> 8. Protect all existing underground utilities during construction. <br /> 9. As-builts of all installed utility systems will be required to be submitted to the inspector <br /> per City Design and Construction Standards and Specifications for Development prior to 'Z <br /> final of the permit. <br /> 10. A 2-year Warranty Bond in the amount of 10% of the construction costs for all <br /> Stormwater Infrastructure shall be submitted to the City prior to final approval/close out <br /> of the permit. <br /> Public Works Permit Fee Breakdown: b g. JUL 25 2017 a <br /> • <br /> Grading (6,500CY) $320.00 POSTING S// /, <br /> Misc. Minor(Drainage) $25.00 CITY OF EVERETT <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 Permit Services <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> 161,41/0V6C111116/L7111117.- City of Everett from any and all claims for damages,costs,expenses,or <br /> causes of action that may arise because of installation and maintenance of the <br /> Approved for Construction Date improvement or other right-of-way use hereto applied for and further agrees to <br /> pp remove same upon notice from the City and to replace public property <br /> dams•-• • . <br /> FINAL INSPECTION Date _ 'Z5 --'Z <br /> Approved as Constructed . . . - . Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.